Townhouses-LR000726ALPHA TESTING, INC.
2209 Wisconsin St.,Suite 100
DoII~, Texos 75229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
TESTED FOR
LEMP DEVELOPMENT
DALLAS, TEXAS
REPORT OF FIELD
COMPACTION TESTS
DATE 07/26100
PROJECT
COPPELL TOWNHOMES
COPPELL, TEXAS
OUR REPORT NO.
00430-41 B
TEST DATA:
TEST ~. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE P~RCENT
NO. DATE NUMBER MOISTURE DRY ~NS~Y MOISTURE DRY OENSn~ COMP^C~ON COMMENT*
% PCF % PCF
677 07/26/00 FG-2.8 3 21.6 98.8 24.2 98 100 1-A
678 07/26/00 FG-2.8 4 20.0 101.9 22.5 100 98 1-A
679 07/26/00 FG-3.1 4 20.0 101.9 21.1 101 99 1-A
680 07/26100 FG-3.6 4 20.0 101.9 22.8 101 99 1-A
681 07/26/00 FG-3.7 4 20.0 101.9 21.7 102 100 1 -A,
682 07/26/00 FG-4.5 4 20.0 101.9 22.5 101 99 1-A
683 07/26/00 FG-4.6 4 20.0 101.9 21.9 101 99 1-A
677 BLOCK A, PAD #17
678 BLOCKA, PAD#18
679 BLOCK A, PAD #19
680 BLOCK A, PAD #20
681 BLOCKA, PAD#21
682 BLOCK B, PAD fir26
683 BLOCK B, PAD #27
CC: STEVE TOPLETZ, ANDANTE /,~ /,,~
* A. IN PLACE PERCENT MOISTURE AND pERCENT COMPACTION COMPLY WITH SPECIFICATIONS ~,
1. FILL
2. NATURAL SUBGRADE S. PERCENT COMPA~:TION DOES NOT COMPLY WITH SPECIFICATIONS R
3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
4. CEMENT~/~EATED D. RETEST ALPHA/TESTING, INC.
Geotechnical Engineering · Construction Materials Testing ·Environmentai Engineering ·. Consulting
ALPHA TESTING, INC.
2209 Wisconsin St., Suite
Dallas, Texas 75229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
TESTED FOR
LEMP DEVELOPMENT
DALLAS, TEXAS
REPORT OF FIELD
COMPACTION TESTS
DATE 07/26~0
PROJECT
COPPELL TOWNHOMES
COPPELL, TEXAS
OUR REPORT NO. 00430~,1A
TEST DATA:
TEST ___~_.. ELEV. SOIL ID OP~MUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
NO. DATE NUMBER MOISTURE DRY D~NSR'Y MOISTURE DRY ~Nsm~ COMP^C'nO~ COMMENT*
% PCF % PCF
671 07/26/00 FG-3.6 4 20.1 101.9 20.4 101 99 1-A
672 07/26/00 FG-3.5 4 20.1 101.9 20.9 100 98 1-A
673 07/26/00 FG-3.5 4 20.1 101.9 20.8 100 98 1-A
674 07/26/00 FG-3.5 4 20.1 101.9 22.1 100 98 1-A
675 07/26/00 FG-3.6 4 20.1 101.9 22.0 99 97 1-A
676 07/26/00 FG-3;7 4 20.1 101.9 21.5 100 99 1-A
677 07/26/00 FG-2.8 4 20.1 101.9 20.6 101 99 1-A
I P-~ I L~.~ I IUI~I:
671 CLUB HOUSE AREA
672 BLOCKA, PAD#10
673 BLOCK A, PAD #11
674 BLOCKA, PAD#12
675 BLOCK A, PAD #13
676 BLOCK A, PAD #14
677 BLOCKA, PAD#16
CC: STEVETOPLETZ, ANDANTE
1. FILL
2 NATURAL SUBGRADE
3, LIME STAbiLIZED
4. CEMENT TREATED
* A. IN pLACE PERCENT MOisTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS
B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIF~CATIONS
D. RETEST
ALPI~A TESTING, INC.
Geotechnical Enginee#ng · Construction Materals Testing · Environmental Engineering · Consulting
ALPHA TESTING,-INC.
220~ Wisconsin St., Suite I00
Dallos, Texas 75229
972/620-8911 - 972/263-4937 (Metro.)
FAX: {)72/406-8023
REPORT OF FIELD
COMPACTION TESTS
TESTED FOR LEMP DEVELOPMENT DATE 07/26/00
DALLAS, TEXAS
PROJECT
COPPELL TOWNHOMES
COPPELL, TEXAS
OUR REPORT NO. 00430~,1
TEST DATA:
TEST ~ ELEV, SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
NO. DATEDEPTH~ NUMBER ~S~JRE DRY DENSrrY M~STURE DRY DENS~Y COM~AcnoN COMMENT*
% PCF % PCF
664 07/26/00 FG-4.9 4 20.0 101.9 21.4 101 100 I-A
665 07/26/00 FG-4.1 4 20.0 101.9 22.0 100 98 1-A
666 07/26/00 FG~,.6 4 20.0 101.9 20.0 101 100 1-A
667 07/26/00 FG-3.6 4 20.0 101.9 23.3 98 96 1 -A
668 07/26/00 FG-4.3 4 20.0 101.9 21.8 99 98 1 -A
669 07/26/00 FG-3.9 4 20.0 101.9 21.3 100 98 1-A
670 07/26/00 FG-3.6 4 20.0 101.9 20.7 101 99 1-A
TEST LOCATION:
664 BLOCK A, PAD ~
665 BLOCK A, PAD #3
666 BLOCK A, PAD ~4
667 BLOCK A, PAD #5
668 BLOCK A, PAD ~
669 BLOCK A, PAD #7
670 BLOCK A, PAD ~P3
CC: STEVE TOPLETZ, ANDANTE
1. FILL A. tN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS
2. NATURAL SUBGRADE B. PERCENT COMPACTION OOES NOT COMPLY wn~l SPECIFICATIONS
3. LIME STABILIZED C, PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
4. CEMENT TREATED D. RETEST
Geotechnical Engineering · Construction Materials Testing · Environmental Engineedng · Consulting