Loading...
Townhouses-LR000805ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas. Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOr LEMP DEVELOPMENT DATE 08/05/00 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-57B COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OI~tIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH~ NUMBER MOIS3~JRE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* 1063 08/05/00 FG-0.5 4 20.1 101.9 22.6 102 100 1-A 1064 08/05/00 FG-0.5 4 20.1 101.9 23.4 102 100 1 -A 1065 08/05/00 FG-0.6 4 20.1 101.9 21.1 103 101 1-A 1066 08/05/00 FG-0.5 4 20.1 101.9 22.5 101 99 1-A 1067 08/05/00 FG-0.3 4 20.1 101.9 21.1 102 100 1-A 1068 08/05/00 FG-0.3 4 20.1 101.9 21.3 100 98 1-A 1069 08/05/00 FG-0.6 4 20.1 101.9 21.4 102 100 1-A TEST LOCATION: 1063 CLUBHOUSE AREA 1064 BLOCK B, PAD #2 1065 BLOCK B, PAD #3 1066 BLOCK B, PAD #4 1067 BLOCK B, PAD #5 1068 BLOCK B, PAD#6 1069 BLOCK B, PAD #7 CC: STEVE TOPLETZ, ANDANTE 1 FILL 2. NATURAL ~UBGRADE 3. LIME STABILIZED 4. CEMENT TREATED * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WI~H SPECIFICATIONS O. RETI~ST ALPHA TESTING, INC. Geotechnical Engineedng · Construction Materials Testing · Environmental Engineering · Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR LEMP DEVELOPMENT DATE 08/05/00 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-57 TEST DATA: TEST ~. ELEV SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSrT~ COMPACTION COMMENT* % PCF % PCF 1049 08/05/00 FG-1.5 3 21.6 98.8 23.4 95 96 1-A 1050 08/05/00 FG-1.8 3 21.6 98.8 24.0 96 97 1 -A 1051 08/05/00 FG-I.1 3 21.6 98.8 23.7 97 98 1-A 1052 08/05/00 FG-I.5 3 21.6 98.8 24,4 96 97 1-A 1053 08/05/00 FG-1.6 4 20.1 101.9 23.7 100 99 1 -A 1054 08/05/00 FG-1.3 4 20.1 101.9 20.4 101 99 1-A 1055 08/05/00 FG-1.4 4 20.1 101.9 21.0 100 98 1-A TEST LOCATION: 1049 BLOCK B, PAD #39 1050 BLOCK B, PAD #38, 1051 BLOCK B, PAD #37 1052 BLOCK B, PAD #36 1053 BLOCK B, PAD #35 1054 BLOCK B, PAD #34 1055 BLOCK B, PAD #33 CC: STEVE TOPLETZ, ANDANTE 1. FILL * A~ IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3 LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENTTREATED D RETEST ALPHA q~ESTING, INC. Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting