Loading...
Townhouses-LR000801ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR LEMP DEVELOPMENT DATE 08/01/00 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430~9B COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 846 08/01/00 FG-1.3 2 19.0 100.4 19.9 99 98 1-A 847 08/01/00 FG-1.6 2 19.0 100.4 20.2 101 100 1 -A 848 08/01/00 FG-2.1 2 19.0 100.4 21.6 101 100 1-A 849 08/01/00 FG-2.2 2 19.0 100.4 22.1 101 100 1-A 850 08/01/00 FG-2.7 2 19.0 100.4 22.6 100 99 1-A 851 08/01/00 FG-3.6 2 19.0 100.4 21.1 97 97 1-A 852 08/01/00 FG-3.0 2 19.0 100.4 19.1 100 100 1-A TEST LOCATION: 846 BLOCK A, PAD #18 847 BLOCK A, PAD #19 848 BLOCK A, PAD #20 849 BLOCK A, PAD #21 850 BLOCKA, PAD #57 851 CLUBHOUSE AREA 852 CLUBHOUSE AREA CC: STEVE TOPLETZ, ANDANTE · 1 FILL A.IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WiTH SPECIFICATIONS 2 NATURAL SUB(gRADE B PERCENT COMPACTION DOES NOT COMPLY W~TH SPECIFICATIONS R 3 LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4.CEMENT TREATED D RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Cons~Itin~ ALPHA TESTING, INC. 2209 Wisconsin St., Suite Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) lAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR LEMP DEVELOPMENT DATE 08/01/00 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORTNO. 00430-49A TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTHS,,,,,,, NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* 839 08/01/00 FG-2.0 2 19.0 100.4 23.6 99 98 1-A 840 08/01/00 FG-2.0 2 19.0 100.4 23.8 99 99 1-A 841 08/01/00 FG-2.0 2 19.0 100.4 23.2 97 97 1-A 842 08/01/00 FG-2.1 2 19.0 100.4 22.8 97 97 1-A 843 08/01/00 FG-2.2 2 19.0 100.4 23.1 100 99 1-A 844 08/01/00 FG-1.3 2 19.0 100.4 22.6 98 98 1-A 845 08/01/00 FG-1.3 2 19.0 100.4 22.9 100 99 1-A TEST LOCATION: 839 BLOCK A, PAD #10 840 BLOCK A, PAD #11 841 BLOCK A, PAD #12 842 BLOCK A, PAD #13 843 BLOCK A, PAD #14 844 BLOCK A, PAD #16 845 BLOCK A, PAD #17 CC: STEVE TOPLETZ, ANDANTE 1 FILL * A iN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS ~ 2 NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ~r~l~ 3 L~ME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENTTREATED D RETEST ALP Geotechnical Engineering · Construction Materials Testing · Environmental Engineering . ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR LEMP DEVELOPMENT DATE 08/01/00 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-49 TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH-~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSl3~' COMPACTION COMMENT* I 832 08/01/00 FG-2.9 2 19.0 100.4 19.3 100 99 1-A 833 08/01/00 FG-2.1 2 19.0 100.4 21.8 97 97 1-A 834 08/01/00 FG-2.6 2 19.0 100.4 21.2 102 101 1-A 835 08/01/00 FG-1.6 2 19.0 100.4 20.6 100 100 1-A 836 08/01/00 FG-2.3 2 19.0 100.4 21.9 99 98 1-A 837 08/01/00 FG-1.9 2 19.0 100.4 20.6 101 101 1-A 838 08/01/00 FG-1.6 2 19.0 100.4 22.3 99 99 1-A TEST LOCATION: 832 BLOCKA, PAD 833 BLOCKA, PAD #3 834 BLOCKA, PAD ~4 835 BLOCKA, PAD #5 836 BLOCKA, PAD #6 837 BLOCK A, PAD #7 838 BLOCKA, PAD #9 CC: STEVE TOPLETZ, ANDANTE 1. FILL A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURALSUBGRAOE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS e~ 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENTTREATED D RETEST P Geotechnical Engineering · Construction Materials Tosting · Environmontal Engineering ·