Loading...
Northlake 635 BP 7C-CS 861126ESSEX WIRE ADDITION Assessment Fees Construction Permit 513.050.00 Water/ Wastewater Availability ~ 56.021.12 Sewer Connection Inspection 6100.00 Water Meter Installation Inspection 5100.00 Utility Final Inspection 575.00 Cost of Purchasing Meter and Backflow Device 56.229.D0 Total: 525.575.12 C'r ~ ~`~~ "~ `Additionally, the landscape agreement must be submitted to the City prior to ~i-ty Council's approval.