Loading...
Forest Cove 2-CS 990622 (2)ff 5) The City With A Beautiful Future P.O. BOX 478 COPPELL, TEXAS 75019 June 22, 1999 Robert Pope, P.E. Robert Pope and Associates 4011 West Plano Parkway, Suite 104 Plano, Texas 75093 Sincer L. i I •vis Co on Inspector cc: Mike Martin, Assistant City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Procker /subdivsn/O1fnals/forstcv2 P.O. Box 478 Coppell, Texas 75019 972- 462 -0022 FILE RE: Forest Cove, Phase II Final Acceptance Dear Robert Pope: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two -year maintenance bonds and as -built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. (Witness) (Principal) (Surety) By: BOND NO.: 22002099 MAINTENANCE BOND KNOW ALL MEN BY THESE PRESENTS: That Site Concrete, Inc. as Principal, and Liberty Mutual Insurance Company as Surety, are held and firmly bound unto City of Coppell Obligee, in the full and just sum of One Hundred Ninety Nine Thousand Two Hundred Twenty Seven 88/100 ($199,227.88), lawful money of The United States for the payment whereof, well and truly to be made, the Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a written contract dated 03/01/98 with Pacific United Development for Paving and Utilities for Forest Cove Estates, Phase II, Coppell, TX and WHEREAS, Obligee provides that the Principal will furnish a bond conditioned to guarantee for the period of two (2) year(s) after approval of the final acceptance on said job, by the City, against all defects in workmanship and materials which may become apparent during said period. NOW, THEREFORE, the condition of this obligation is such that, if the Principal shall indemnify the Obligee for all loss that the Obligee may sustain by reason of any defective materials or workmanship which become apparent during the aforesaid period, then this obligation shall be void, otherwise to remain in full force and effect. Signed, Sealed and Dated This 1st Day of March, 1998 Site Concrete, Inc. By` Liberty Mutual Insurance Company Michael B. Hill, Attorney -In -Fact THISI POWER OF ATTORNEY IS NOT UNLESS IT IS PRINTED ON RED BACK°""OUND. This Power of Attorney limits the act of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON, MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the 'Company a Massachusetts mutual insurance company,; pursuant to and by authority of the By -law and Authorization hereinafter set forth, does hereby name, constitute and appoint, WILLIAM D. BALDWIN, SUZANNE C. BALDWIN, CINDY FOWLER, MICHAEL B. HILL, DEBBIE SMITH, ALL OF THE CITY OF RICHARDSON, STATE OF TEXAS each individually if there be more than, one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding SEVENTY FIVE MILLION"• DOLLARS 75,000,000 each, and the execution of such bonds or undertakings, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons. That this power is made and executed pursuant to and by authority of the following By -law and Authorization: ARTICLE XVI Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer or other official of the company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the company by their signature and execution of any such instruments and to attach thereto the seal of the company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys -in -fact: Pursuant to Article XVI, Section 5 of the By -laws, Assistant Secretary Garnet W. Elliott is hereby authorized to appoint such attorneys -in -fact as may be necessary to act in behalf of the company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. That the By -law and the Authorization above set forth are true copies thereof and are now in full force and effect. IN WITNESS WHEREOF, this instrument has been subscnbed by its authorized officer and the corporate seal of the said Liberty Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 18th day of Fehniary 19 98 Gamet W. Elliott, Assistant Secretary COMMONWEALTH OF PENNSYLVANIA ss COUNTY OF MONTGOMERY On this 18th me to be the therein des ged that he executed seal and his signatu IN TESTIMO March 19 9R LIBERTY MUTUAL INSURANCE COMPANY February A.D. 19 98 before me, a Notary Public, personally came the individual, known to 'dual and officer of Liberty Mutual insurance Company who executed the preceding instrument, and he acknowled- the seal affixed to the said preceding instrument is the corporate seal of said company; and that said corporate as duly affixed and subscribed to the said instrument by authority and direction of the said company. set my hand and affix my official seal at Plymou Meeting; the day and year first above written. �J i..gl1L SEAL UON to C [EL S Notary pub c P n ur^ A[ R10 13cm ry .,cu v Mty Cor^ E p,s "Ur," CERTIFIC E Notary Public 430917 I, the undersigne•, to retary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full, true and c• :c copy, is in full force and effect on the date of this certificate; and I do further certify that the officer who executed the said power of attorney was one of the officers specially authorized by the chairman or the president to appoint any attorney -in -fact as provided in Article XVI, Section 5 of the By -laws of Liberty Mutual Insurance Company. This certificate may be signed by facsimile under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company wherever appearing upon a certified copy of any power of attorney issued by the company, shall be valid and binding upon the company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, this 1 st day of tary THIS POWER OF ATTORNEY MAY NOT BE USED TO EXECUTE ANY BOND WITH AN INCEPT' E AFTER February 18 20 00 SITE CONCRETE, INC. Street Address: 3332 Roy Orr Grand Prairie, TX 75050 -4207 972 -313 -0733 Fax 972 -513 -0825 Mailing Address: P.O. Box 154489 Irving, Texas 75015 -4489 Estimating Fax 972 -513 -0661 PACIFIC UNITED L.P. 2445 MIDWAY ROAD, SUITE 106 CARROLLTON, TEXAS 75006 JOB NO: 97 -96 PROJECT: FOREST COVE, Phase 1 II EST. NO. PAVING #3 FROM: 04/21/98 TO: 05/20/98 (—QUANTITIES----) ITEM DESCRIPTION PLAN 0 THIS TOTAL TO UNIT AMOUNT AMOUNT NO. OF ITEMS ESTIMATE DATE PRICE THIS ESTIMATE TO DATE PHASE 11 1. 6" reinforced concrete street 2. 6" reinforced concrete alley 3. 6' lime subgrade including lime 4. Barrier free ramps 5. Sawcut existing concrete 6. 4' concrete sidewalk 7. Silt fence 8. Payment/performance /maintenance bond SY 7,210 7,210 $17.50 $0.00 $126,175.00 SY 1,430 1,430 $18.00 $0.00 $25,740.00 SY 9,430 9,430 $2.75 $0.00 $25,932.50 EA 12 12 $500.00 $0.00 $6,000.00 LF 88 88 $10.00 $0.00 $880.00 LF 998 998 $12.00 $0.00 $11,976.00 LF 6,691 6,691 $1.20 $0.00 $8,029.20 LS 1 1 $3,071.00 $0.00 $3,071.00 TOTAL AMOUNT TO DATE $207,803.70 PACIFIC UNITED L.1 2445 MIDWAY ROAD, SUITE 106 CARROLLTON, TEXAS 75006 SITE CONCRETE, INC. Street Address: 3332 Roy Orr Grand Prairie, TX 75050 -4207 972 -313 -0733 Fax 972 -513 -0825 Mailing Address: P.O. Box 154489 Irving, Texas 75015 -4489 Estimating Fax 972 513 -0661 JOB NO: 97 -96 PROJECT: FOREST COVE, Phase II EST. NO. UTILITIES #2 FROM: 04/21/98 TO: 05/20/98 QUANTITIES ITEM DESCRIPTION PLAN 0 THIS TOTAL TO UNIT AMOUNT AMOUNT NO. OF ITEMS ESTIMATE DATE PRICE THIS ESTIMATE TO DATE Water 1. 8" PVC (DR -14) LF 2,023 2,023 $14.75 $0.00 $29,839.25 2. 8" x 8" Tapping Sleeve Valve EA 3 3 $1,250.00 $0.00 $3,750.00 3. 8" Gate Valve EA 2 2 $675.00 00.00 $1,350.00 4. Fire Hydrant Assembly EA 4 4 51,450.00 $0.00 05,800.00 5. 1" Single Water Services EA 41 41 $335.00 $0.00 $13,735.00 6. 1" Single Water Services by Bore EA 3 3 02,000.00 $0.00 $6,000.00 7. Connect to Existing EA 3 3 0300.00 $0.00 0900.00 8. Trench Safety LF 2,023 2,023 $1.00 $0.00 $2,023.00 9. Water Test LF 2,023 2,023 $0.75 $0.00 $1,517.25 Sanitary 1. 8" PVC LF 2,945 2,945 $14.85 00.00 $43 733.25 2. Sanitary Line by Bore EA 68 68 $185.00 $0.00 $12,580.00 3. 4' Standard Manhole EA 10 10 $1,450.00 $0.00 $14,500.00 4. Cleanouts EA 1 1 $275.00 $0.00 $275.00 5. 4" Services EA 43 43 $300.00 $0.00 $12,900.00 6. Connect to Existing Manhole EA 1 1 0350.00 $0.00 $350.00 7. Trench Safety LF 3,013 3,013 31.00 00.00 03,013.00 8. Test TV Sewer LF 3,013 3,013 01.10 $0.00 33,314.30 Storm 1. 21" RCP LF 180 180 $29.00 00.00 $5,220.00 2. 18" RCP LF 105 105 022.00 $0.00 02,310.00 3. 3' Wide Concrete Flume LF 25 25 $38.00 $0.00 3950.00 4. 4' Wide Concrete Flume LF 22 22 043.00 $0.00 $946.00 5. 4' Inlet EA 1 1.00 $1,750.00 $0.00 $1,750.00 6. 10' Inlet EA 1 1.00 $2,500.00 $0.00 02,500.00 7. 14' Inlet EA 1 1.00 $3,250.00 00.00 03,250.00 8. 3' x 3 Inlet EA 1 1.00 31,850.00 00.00 $1,850.00 9. 18" Sloping Headwall EA 2 2.00 01,250.00 30.00 52,500.00 10. 21" Sloping Headwall EA 2 2.00 01,250.00 00.00 02,500.00 11. Grouted Rock Rip Rap SY 80 80 $85.00 00.00 56,800.00 12. Grade to Drain CY 143 143 $10.00 30.00 $1,430.00 13. Trench Safety LF 285 285 01.00 00.00 0285.00 Miscellaneous 1 Payment Performance Bonds LS 1 1 02,781.00 50.00 52,781.00 TOTAL AMOUNT TO DATE $190,652.05