Eason Petroleum-LR02042310575 NewkJrk Street
Suite 780
Dallas, Texas 75220
972.83 1.1 ! ! 1
FAX 972.831.0800
Master Construction
P. O. Box 226984
Dallas TX 75222-6984
Attention: Mr. Don Weempe, P.E.
Date: April 23, 2002
Report ID: D5296 - PB - 4865
Report of Concrete Compressive Strength Tests
Project: 409 DENTON TAP Supplier: BEALL
COPPELL, TEXAS
Location: PARKING LOT PA VING - OUTSIDE CURB EDGE ON WEST SIDE
Cast Date: 4/12/2002 Ticket: 8goog196 Batch Time: 10:04
Specimens Made By: MW Truck Number: 118 Test Time:
Concrete6 SK Mix:
Physical Properties of Concrete (ASTM C143, C231, C138, C1064)
Specified Strength (f'c) Slump Air Content Density
4000 psi @ 28 days 4.5 in. 1.3 % pcf.
Temperature
deg. F
COmpressive Strengths (ASTM C39)
Specimen Age in Diameter Area Load
Number Days (Inches) (sq. Inches) (lbs.)
Compressive Percent
Strength (psi) of f'c
Type of
Fracture
i I 7 6.00 j 28.27
2 I 7 I ,6.00 28.27
Patton, Burke & Thompson,
~//
11~010 4100
1t~730 4020
Average: 4060
cc: BEALL
102
Wedge
Wedge
PATTON, BURKE & THO .MPS~ON, LLC
Engineenng Consultants