Loading...
Amberpoint BP-LR020515 (2)REPORT OF DRILLED BELLED PIER OBSERVATION Report Number:. g4021029.0253 Service Date: April 29, 2002 Client: Transwes{em Commercial Services . Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: May 15, Project: Amberpoint B Amberpoint B Coppell, Texa Project Number: 940 8901 Carpenter Fn~y., Suite #100 Dallas, Texas 75247 (214) 630-1010 2002 Jilding No. 1 Js. Pk. @ Coppell :>1029 Services: Drilled belled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet for recorded data. Technician: Gent Graham Report Distribution: (1) Transweatem Commercial Services (1) O'Bden & Associates Inc (1) TechnIStmcturas Inc (1) City of C~pp~ll - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates Reviewed by: HBC Erlg~.,~ Eugene Harbour (1) City of Coppell - Conatr Insp (1) State Farm Insurance Pdnctpat The tests were performed In general e__rco__,dance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and ara not necessarily indicative of the properties of other apparently similar or Idend~al materials. Page 1 of 1 .,~=~,~.~ LU