Amberpoint BP-LR020515 (2)REPORT OF DRILLED BELLED PIER OBSERVATION
Report Number:. g4021029.0253
Service Date: April 29, 2002
Client: Transwes{em Commercial Services .
Attn: Jim Gaspard
5001 Spring Valley Rd. Suite 600W
Dallas TX 75244
Report Date: May 15,
Project: Amberpoint B
Amberpoint B
Coppell, Texa
Project Number: 940
8901 Carpenter Fn~y., Suite #100
Dallas, Texas 75247
(214) 630-1010
2002
Jilding No. 1
Js. Pk. @ Coppell
:>1029
Services: Drilled belled pier observation.
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
drilled belled pier observation. See the attached sheet for recorded data.
Technician: Gent Graham
Report Distribution:
(1) Transweatem Commercial Services
(1) O'Bden & Associates Inc
(1) TechnIStmcturas Inc
(1) City of C~pp~ll - Bldg Insp
(1) Hill & Wilkinson Ltd
(1) Halff Associates
Reviewed by: HBC Erlg~.,~
Eugene Harbour
(1) City of Coppell - Conatr Insp (1) State Farm Insurance Pdnctpat
The tests were performed In general e__rco__,dance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
Indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and ara not necessarily indicative of the properties of other apparently similar or Idend~al
materials.
Page 1 of 1 .,~=~,~.~
LU