Loading...
Amberpoint BP-LR020514CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0214 Service Date: April 15, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spdng Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 14, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. (~ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 3000 psi (~ 28 Days Batch Time: 10:04am Supplier: Potter Track No: 102 Mix i.D. NO.: 9337 Plant: 16 Ticket No: 612967 Sample Information Sample Time: 10:30am Date Cast: April 15, 2002 Technician: Gerry Graham Weather Conditions: Cloudy Accumulative Yards: 10 Placement Method: Direct Discharge Sample Locations: PierG.7-11 Placement Location: Pier G.7-11, H.4-11, J.4-11 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature,o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Result 5.75 70 Specification Test Method 6-7 ASTM C-143 N/A ASTM C1064 ASTM C-1064 Set Specimen Diameter Area Date No. ID (inches) (sq. inches) Tested 1 1 6.00 28.27 04/22/2002 I 2 6.00 28.27 04/22/2002 I 3 6.00 28.27 05/13/2002 I 4 6.00 28.27 05/13/2002 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 104,380 3,690 7 107,380 3,800 Average 3,750 28 138,590 4,900 28 131,940 4,670 Average 4,790 Services - Obtain samples of fresh concrete at the placement locations, perform required tield tests and cast compressive strength samples. Technician: Gerry Graham Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Associates Inc (1) TechniStructures Inc (1) City of Coppall - Constr Insp (1) City of Coppell - Bldg Insp (1) Hill & Willdnson Ltd (1) Halff Associates (1) State Farm Insurance Reviewed by: HBC Eng~ Eugene Harbour Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This relxxt is exclusively for the use of the client indicated above and shall n~ be reproduced excal~ in full ,~tout the written approval of Termcon. Test results transmitted heroin are only applicalde to the actual samples tested at the location(s) referenced and ara not necesesdly indicative of the propedJes of other apparently similai' or identical Page 1 of 1 o~"~'~='*""" REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0257 Service Date: April 30, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 14, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. (~ Coppell Coppell, Texas Project Number: 94021029 Services: Ddlled belled pier observation On this date, an HBC Engineering technician ardved at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. Technician: Gerry Graham Report Distribution: HB~ng (1) Transweatem Commercial Services (1) City of Coppeil - Bldg Insp (1) O'Brfim & Associates Inc (1) Hill & Wilkinson Ltd Reviewed by: (1) TechniStructures Inc (1) Halff Associates Eugene Harbour (1) City of Coppell - Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, Or DOT test methods. This report is exclusively for the use of the client indicated above and shell not be reproduced except in full without the written approval of Terracan. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not neceesadly indicative of the properties of other apparently similar or identical materials. Page 1 of 1 iii Q. iii n'