Amberpoint BP-LR020510REPORT OF DRILLED BELLED PIER OBSERVATION
Report Number: 94021029.0249
Service Date: Apdl 26, 2002
Client: Transwestem Commercial Services
Attn: Jim Gaspard
5001 Spring Valley Rd. Suite 600W
Dallas TX 75244
8901 Carpenter FP*W., Suite #100
Dallas, Texas 75247
(214) 630-1010
Report Date: May 10, 2002
Project: Amberpoint Building No. 1
Amberpoint Bus. Pk. (~ Coppell
Coppell, Texas
Project Number: 94021029
Services: Ddlled belled pier observation
On this date, an HBC Engineering technician ardved at the above referenced jobsite as scheduled for
drilled pier observation. See the attached sheet(s) for recorded data.
Technician: Gerry Graham
Report Distribution: HBC E~ee~q.
(1) Transwestam Commercial Services (1) City of Coppell - Bldg Insp
(1) O'Bdes & Associates Inc (1) Hill & Wilkinson Ltd Reviewed by:
(1) TechniStructures Inc (1) Halff Associates Eugene Harbour
(1) City of Coppell - Constr Insp (1) State Farm Insurance Principal
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not he reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested et the location(s) raferanced and ara not necessarily indicative of the properties of other apparently similar or identical
materials. Page 1 of I