Loading...
Amberpoint BP-LR020510REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0249 Service Date: Apdl 26, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter FP*W., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 10, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. (~ Coppell Coppell, Texas Project Number: 94021029 Services: Ddlled belled pier observation On this date, an HBC Engineering technician ardved at the above referenced jobsite as scheduled for drilled pier observation. See the attached sheet(s) for recorded data. Technician: Gerry Graham Report Distribution: HBC E~ee~q. (1) Transwestam Commercial Services (1) City of Coppell - Bldg Insp (1) O'Bdes & Associates Inc (1) Hill & Wilkinson Ltd Reviewed by: (1) TechniStructures Inc (1) Halff Associates Eugene Harbour (1) City of Coppell - Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not he reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested et the location(s) raferanced and ara not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of I