Loading...
Amberpoint BP-LR020521REPORT OF CONCRETE OBSERVATION Report Number: 94021029.0268 Service Date: May 6, 2002 Client: Tmnswestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter Fn~., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 21, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. ~;~ Coppell Coppell, Texas Project Number: 94021029 Services: Concrete observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for concrete observation. Upon arriving at the jobsite, HBC's technician was notified that the scheduled concrete placement was cancelled due to the ground was too wet. Technician: Marvin Arandia Report Distribution: (1) Tmnswestem Commercial Sefvioes (1) O*Brien & Associates Inc (1) TechniStructures Inc (1) City of Coppell - Constr insp (1) City of Coppall - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Aesociates (1) State Farm Insurance Reviewed by: HBC,~,~ering Eugene Harbour Principal 'the tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test me~hods. This repo~ is e~Jusively fo~ the use of the indicated above and shall not be reproduced excepl in full without the 'written approval of Termesn. Test results transmitted herein are only apl~icabis to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of o~her apparently simiisr er identical materials: Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0234 Service Date: · Apdl 22, 2002 ~'~'~ Client:Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd: Suite 600W Dallas TX 75244 Report Date: May 21, 2002 8901 Carpenter Frye., Suite fi100 Dallas, Texas 75247 (214) 630-1010 Project: Amberpoint Building No. 1 Amhemoint Bus. Pk. (~ Coppell Coppell, i exa5 Project Number: 94021029 Material Information Specified Strength: 3000 psi ~ 28 Days Batch Time: 12:05pm Supplier: Potter Truck No: 1012 Mix I.D. No.: 9337 Plant: 16 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Ticket No: 613248 Sample In'formation Sample Time: 12:45pm Date Cast: April 22, 2002 Technician: Gerry Graham Weather Conditions: Fair, mostly cloudy Placement Method: Direct Discharge Sample Locations: Piers H.3/1, H.3/1.2 and H.6/1.2 Placement Location: Piers Result Specification Test Method 5.50 5-7 ASTM C-143 N/A 79 ASTM C1064 76 ASTM C-1064 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psO I 1 6.00 28.27 04/29/2002 7 78,850 2,790 I 2 6.00 28.27 04/29~2002 7 84,280 2,980 Average 2,890 1 3 6.00 28.27 05~20/2002 28 118,660 4,200 1. 4 6.00 28.27 05/20/2002 28 119,580 4,230 Average 4,220 NOTE: RE: Concrete Ticket f/613248: (1) Track arrived on jobsite at 12:10 p.m. with a 1' slump. (2) Field Technician informed superintendent with Potter. (3) Superintendent requested new concrete load. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT te~t methods. Thla report i~ exclusively for the use of the client indicated above and shall nct be reproduced except in full without the written aplxoval of Tm. Test results transmitted herein are only applicable to the actual samples tested at the incation(s) referenced and are not necessarily iedicative of the properties of other apparently sim~r or identical materials. Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TEST Client: Transwestem Commercial Services Project Number:94021029 Report Number: 94021029.0234 (4) Same driver/same truck/same load with 60+ gallons of water added at plant by batch plant arrived on jobsite. (5) Field technician made test cylinders and concrete was used for piers. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Gerry Graham Report Distribution: (1) Transwestem Commercial Services (1) O'Brien & Associates Inc (1) TeshniStmctures l.nc (1) City of Coppell - Conatr Insp (1) City of Coppell- Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates (1) State Farm Insurance Reviewed by: HBC Engin<~ Eugene Harbour Principal The t_~__~_ were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This relxxt is exclusively for the use dtbe ~ indicated above and shall not be reproduced except in full without the written approva~ of Terrecon. Test results transmitted herein are enly applicable to the actual samples tested at the location(s) referenced and are not neCessarily indicative of the properties of o~her apparently similar or identical materials. Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0232 Service Date: April 22, 2002 Client: Transwestem Commemial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter Frwy., Suite#100 Dallas, Te~s 75247 (214) 630-1010 Report Date: May 21, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 4000 psi (~ 28 Days Batch Time: 4:26am Supplier:. Potter Truck No: 112 Mix I.D~ No.: 9349 Plant: 16 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen No. ID I 1 I 2 Ticket No: 613162 Sample Information SamPle Time: 4:50am Date Cast: April 22, 2002 Technician: Marvin Arandia Weather Conditions: Partly cloudy Accumulative Yards: 10 Placement Method: Direct Discharge Sample Locations: Grid line 2.11N.2 Placement Location: Slab, lines 1.8 to 11 and N to Q 1 3 1. 4 Result Specification Test Method 5.00 ASTM C-143 1.4 ASTM C-231 75 ASTM C1064 56 ASTM C-1064 Age at Maximum Compressive Diameter Area Date Test Load Strength (inches) (sq. inches) Tested (days) (lbs) (psi) 6.00 28.27 0412912002 7 115,710 4,090 6.00 28.27 04/29~2002 7 114,060 4,030 Average 4,060 6.00 28.27 05/2012002 28 140,420 4,970 6.00 28.27 05/20/2002 28 145,1'20 5,130 Average 5,050 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were pen'om~ed in general accordance with applicable ASTM, AASHTO, er DOT test methods. This report is exclusively fer the usa of the client indicated above and shall not he reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page I of 9 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0232 Service Date: April 22, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spdng Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter Fnvy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 21, 2002 Project: Amberpoint Building No..1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 4000 psi (~ 28 Days Batch Time: 5:11am Plant: 16 Supplier: Potter Truck No: 106 Mix I.D. No.: 9349 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Result 5.00 1.6 75 56 Ticket No: 613172 Sample Information Sample Time: 5:40am Date Cast: April 22, 2002 Technician: Marvin Arandia Weather Conditions: Partly cloudy Accumulative Yards: 110 Placement Method: Direct Discharge Sample Locations: Grid line 2.9/P.1 Placement Location: See page 1 Specification Test Method Set Specimen Diameter Area Date No. ID (inches) .(sq. inches) Tested 2 1 6.00 28.27 04/29/2002 2 2 6.00 28.27 04/29/2002 2 3 6.00 28.27 05/20/2002 2 4 6.00 28.27 05/2012002 ASTM C-143 ASTM C-231 ASTM C1064 ASTM C-1064 Age at Test (days) Maximum Compressive Load Strength (lbs) (psi) 7 133,660 4,730 7 126,320 4,470 Average 4,600 28 150,300 5.320 28 156,290 5,530 Average 5,430 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were pen'ormed in general acc~danca with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall nol be reproduced e~cept in lull without the written approval of Terracon. Test results transmitted heroin are only ap~icable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other appareatly similar or identical materials. Page 2 of 9 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0232 Service Date: April 22, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 21, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 4000 psi (~ 28 Days Batch Time: 5:48am Plant: 16 Supplier: Potter Truck No: 106 Mix I.D. No.: 9349 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o 'F: Plastic Unit Weight, pcf: Laboratory Test Data Result 5.00 1.4 75 56 Set Specimen Diameter Area No. ID (inches) (sq. inches) 3 1 6.00 28.27 3 2 6.00 28.27 3 3 6.00 28.27 3 4 6.00 28.27 Ticket No: 613180 Sample Information Sample Time: 6:20am Date Cast: April 22, 2002 Technician: Marvin Arandia Weather Conditions: Partly cloudy Accumulative Yards: 200 Placement Method: Direct Discharge Sample Locations: Grid line 4.1/O.2 Placement Location: See page I Specification Test Method ASTM C-143 ASTM C-231 ASTM C1064 ASTM C- 1064 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 04/2912002 7 122,500 4,330 04~29/2002 7 125,200 4,430 Average 4,380 05/20/2002 28 151,320 5,350 05/20/2002 28 153,350 5,420 Average 5,390 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast COmpressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This repeal is exclusively for the use of the indicated abe~e and shall r~ be reproduced exce~ in full without the written approval of Terrecon. Test results Uansmitted herein are only al~lcable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 9 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0232 Service Date: April 22, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter F~:, Su'~e #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 21, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. (~ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 4000 psi ~ 28 Days Batch Time: 6:37am Plant: 16 Supplier: Potter Truck No: 107 Mix I.D. No.: 9349 Field Test Data Test Ticket No: 613191 Sample Information Sample Time: 7:15am Date Cast: April 22, 2002 Technician: Marvin Arandia Weather Conditions: Clear Accumulative Yards: 300 Placement Method: Direct Discharge Sample Locations: Grid line 5.3/P.2 Placement Location: See page 1 Result Specification Test Method Slump, inches: 5.00 ASTM C-143 Air Content, %: 1.4 ASTM C-231 Concrete Temperature,° F: 74 ASTM C1064 Ambient Temperature, o F: 61 ASTM C-1064 Plastic Unit Weight, pcf: Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) -' Tested (days) (lbs) (psi) 4 1 6.00 28.27 04~29/2002 7 119,410 4,220 4 2 6.00 28.27 04129/2002 7 116,470 4,120 Average 4,170 4 3 6.00 28.27 05/20/2002 28 156,600 5,540 4 4 6.00 28.27 05/20/2002 28 149,620 5,290 Average 5,420 Services - Obtain samples of fresh concrete at the placement locations, perl~orm required field tests and cast compressive strength samples. The tests were I~l'ormed in general accordance with applicable ASTM, AASHTO, or DOT test methods; This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted heroin are only applicable to the actual samples tested at the location(s) referenced and are nct necessarily indicative of the properties of o~her apparently similar or identical materials. Page 4 of 9 o,~w~..,<w CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0232 Service Date: April 22, 2002 Client: Trenswestem Commemial Services Attn: Jim Gaspard 5001 Spdng Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 21, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. (~ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 4000 psi (~ 28 Days Batch Time: 7:27am Plant: 16 Supplier: Potter Truck No: 111 Mix I.D. No.: 9349 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature,o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen No. ID 5 1 5 2 Ticket No: 613201 Sample Information Sample Time: 8:30am Date Cast: April 22, 2002 Technician: Marvin Arandia Weather Conditions: Clear Accumulative Yards: 400 Placement Method: Direct Discharge Sample Locations: Gdd line 6.7~0.3 Placement Location: See page I 5 3 5 4 Result Specification Test Method 5.00 ASTM C-143 1.4 ASTM C-231 76 ASTM C 1064 69 ASTM C-1064 Age at Maximum Compressive Diameter Area Date Test Load Strength (inches) (sq. inches) Tested (days) (lbs) (psi) 6.00 28.27 04/29/2002 7 104,720 3,700 6.00 28.27 04/29/2002 7 * 108,130 3,820 Average 3,760 6.00 28.27 05/20/2002 28 135,730 4,800 6.00 28.27 05/20~2002 28 143,050 5,060 Average 4,930 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except In full without the written approval of Terracen~ Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 5 of 9 o~w~.~.,~ CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0232 Service Date: April 22, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spdng Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 21, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 4000 psi ~ 28 Days Batch Time: 9:07am Plant: 16 Supplier: Potter Truck No: 113 Mix I.D. No.: 9349 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature,o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen No. ID 6 1 6 2 Ticket No: 613213 Sample Information Sample Time: 9:35am Date Cast: April 22, 2002 Technician: Marvin Arandia Weather Conditions: Clear Accumulative Yards: 520 Placement Method: Direct Discharge Sample Locations: Grid line 7.9/0.9 Placement Location: See page 1 6 3 6 4 Result Specification Test Method 5.00 ASTM C-143 1.5 . ASTM C-231 75 ASTM C1064 74 ASTM C-1064 Age at Maximum Compressive Diameter Area Date Test Load Strength (inches) (sq. inches) Tested (days) (lbs) (psi) 6.00 28.27 04/29/2002 7 107,430 3,800 8.00 28.27 04/29/2002 7 112,590 3,980 Average 3,890 6.00 28.27 05/20/2002 28 143,800. 5,090 6.00 28.27 05/20/2002 28 137,670 4,870 Average 4,980 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the clla~ indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are o~ly applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 6 of 9 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0232 Service Date: April 22, 2002 Client: Transwestem Commemial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter F~vy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 21,2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. (~ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 4000 pSi (~ 28 Days Batch Time: 10:16am Supplier: Potter Truck No: 107 Mix I.D. No.: 9349 Plant: 16 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature,o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Result 5.50 1.4 77 76 Ticket No: 613226 Sample Information Sample Time: 10:30am Date Cast: April 22, 2002 Technician: Marvin Arandia Weather Conditions: Clear Accumulative Yards: 640 Placement Method; Direct Discharge Sample Locations: Grid line 8.8/P.8 Placement Location: See page I SpecificatiOn Test Method Set Specimen Diameter Area Date No. ID (inches) (sq. inches) Tested 7 1 6.00 28.27 04/29/2002 7 2 6.00 28.27 04/29/2002 7 3 6.00 28.27 ' 05/20/2002 7 4 6.00 28.27 05/20/2002 ASTM Co143 ASTM C-231 ASTM C1064 ASTM C-1064 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 130,740 4,620 7 123,180 4,360 Average 4,490 28 152,340 5,390 28 159,400 5,640 Average 5,520 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test me{hods. This report is exclusively fa' the use of the client indicated eixwe and shall n~ be reproduced except In full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently siroilar or identical materials. Page 7 of 9 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0232 Service Date: April 22, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 I~qGINE. E~R~NG 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 21, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. (~ Coppell Coppell, Texas. Project Number: 94021029 Material Information Specified Strength: 4000 psi ~ 28 Days Batch Time: 10:49am Supplier: Potter Truck No: 106 Mix I.D. NO.: 9349 Plant: 16 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature,o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Result 5.50 1.7 8O 84 Ticket No: 613233 Sample Information Sample Time: 11:10am Date Cast: April 22, 2002 Technician: Marvin Arandia Weather Conditions: Clear Accumulative Yards: 710 Placement Method: Direct Discharge Sample Locations: Grid line 9.6/O.2 Placement Location: See page 1 Specification Set Specimen Diameter Area Date No. ID (inches) (sq. inches). Tested 8 1 6.00 28.27 04/29/2002 8 2 6.00 28.27 04/29/2002 8 3 6.00 28.27 05/2012002 8 4 6.00 28.27 05/20/2002 Test Method ASTM C-143 ASTM C-231 ASTM C1064 ASTM C-1064 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 128,780 4,550 7 129,640 4,580 Average 4,870 28 158,540 5,610 28 161,560 5,710 Average 5,660 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods; This report is exclusively for the use of the client indicated above and shall not bo reproduced except in full without the written approval of Tenacen. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar ~ identical materials. Page 8 of 9 o~_w,m~....w CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0232 Service Date: April 22, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: May 21, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified strength: 4000 psi (~ 28 Days Batch Time: 11:25am Supplier: Potter Track No: 111 Mix I.D. No.: 9349 Plant: 16 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen No. ID 9 1 9 2 Ticket No: 613241 Sample Information Sample Time: 12:00pm Date Cast: April 22, 2002 Technician: Marvin Arendia Weather Conditions: Clear Accumulative Yards: 800 Placement Method: Direct Discharge Sample Locations: Grid line 10.7/P.1 Placement Location: See page 1 9 3 9 4 Result Specification Test Method 5.75 ASTM C-143 1.6 ASTM C-231 86 ASTM Cl 064 84 ASTM C-1064 Age at Maximum Compressive Diameter Area Date Test Load Strength (inches) (sq. inches) Tested (days) (lbs) (psi) 6.00 28.27 04/29/2002 7 107,780 3,810 ' 6.00 28.27 04/29/2002 7 107,400 3,800 Average 3,8'10 6.00 28.27 05/20/2002 28 137,550 4,860 6.00 28.27 05/20/2002 28 134,000 4,740 Average 4,800 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Marvin Arandia Report Distribution: (1) Transwestarn Commercial Se~ices (1) O'Brien & Associates thc (1) TechniStmctures Inc (1) c~ of Coppea - Constr Insp (1) City et' Coppell - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates (1) State Farm Insurance Reviewed by: Eugene Harbeur The tests were performed in general accordarme wfth applicabis ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the ~ indicated above and shall not be reproduced exce~ In full without the written approval of Ten'acen. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of cthor apparently similar or identical materials. Page 9 of 9