Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northpoint Dr-LR020516 (2)
REPORT OF SOIL-LIME MIXTURE PULVERIZATION ENGINEERING, I~C. Date of Service: Client No.: Client: 05/16/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: 94021061.0037 Project No.: 94021061 , Project: ~'"~rthpoint Drive & Assoc~atea Utilities Coppell, Texas Contractor: Test Location: Gien Thurman, Inc. Paving, Northpointe Drive Specification Requirements: Minimum Passing 1 3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist Method: NTCOG TEST 1-3/4' SIEVE #4 SIEVE NO. LOCATION % PASSING % PASSING 1 Sta. 20+50 100 60 2 Sra. 23+50 100 62 3 Sta. 26+50 100 ~ 60 4 Sta. 28+00 100 62 5 Sta. 1+50 100 70 6 Sra. 20+00 100 64 7 Sta. 16+50 100 64 8 'Sta. 13+75 100 ~ 62 . /1l/ Technician: R. Montgomery ~ ~ , _ ,__ Report Distribution: (1) Transwestem Commercial Services (1) Glenn Thurman, Inc. (1) Halff Associates (1) City of Coppell - Engineering 309 Engineering, Inc. (1) City of Coppell -Bldg. hasp. (1) State Farm Insurance (1) Moss Construction Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of ItBC Engineering, Inc.