CF-Coppell Rd SC-LR020521Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF MORTAR/GROUT TESTS
CLIENT: Texas Unified Constructors, Inc.
PROJECT: Field Service Offices & Maintenance Fac.
Coppell, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 01.1054
DATE: 21 May 2002
SUPPLIER: Quality Masonry
Exterior face brick, storage building, northwest corner,
8'-1 O' above finished floor
SAMPLE DATA: SET 1
Truck No.
Ticket No.
Time Batched
Time Sampled 11:45am
Mortar Temp. (ASTM C1064} 82°F
Air Content (ASTM C173)
Unit Weight (ASTM C138l
SET 2 MIX NO. Type "N" Mortar
Cement
Cement
Sand
in.
1.0 in.
Water
Admix //1
Admix //2.
AEA
COMPRESSIVE STRENGTH TESTS IASTM C39)
(Standard 2 inch x 2 inch x 2 inch Cube)
Cube Flow Age Test
Number % Days Date
Total Load Compressive Required
Pounds Strength 2S-Day
psi Strength
247 7 O5/28/01
248 28 06/18/01
249 28 06/18/01
8,900 2230
28-Day Average 1800'
*per specifications and superintendent
TECHNICIAN:
DISTRIBUTION:
CBC (11:30am-1:30pm)
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF MORTAR/GROUT TESTS
CLIENT: Texas Unified Constructors, Inc,
PROJECT: Field Service Offices & Maintenance Fac.
Coppell, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.:
DATE:
SUPPLIER:
01.1054
21 May 2002
Quality Masonry
Exterior face brick, storage building, northwest corner,
B'-lO' above finished floor
SAMPLE DATA: SET 1
Truck No.
Ticket No.
Time Batched
Time Sampled 11:45am
Mortar Temp. (ASTM C1064) 82°F
Air Content (ASTM C173)
Unit Weight (ASTM C138)
SET 2 MIX NO. Type "N" Mortar
Cement
Cement
Sand
in.
1.0 in.
Water
Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39)
(Standard 2 inch x 2 inch x 2 inch Cube)
Cube Flow Age Test Total Load Compressive Required
Number % Days Date Pounds Strength 28-Day
psi Strength
247 f'7 05/28/01 8,900
248 ~ 06/18/01 :[:3,4Q0
249 06/18/01 :~;~,700
28-Day Average
2230 _
3350~
3270-- 1800'
2870 Walnut Hill Lane
CBC (11:30am-1:30pm)
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
Dallas, Texas 75229
TECHNICIAN:
DISTRIBUTION:
(214) 351-6419 Fax (214) 351-5148
superintendent
*per specifications and ~