Loading...
Deforest Court-LR020524CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021148.0002 Service Date: April 25, 2002 Client: The Holmes Builders Attn: Jon Dostert/Dean Trudell 1406 Halsey Way Suite 100 Carmllton TX 75007 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: 11:10am Supplier: Redi-Mix Truck No: 157 Mix I.D. No.: 914MR Plant: I Ticket No: 17567 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: 8g01 Garpenter Fva, y., Suite #100 Dallas, Texas 75247 (214) 630-1010 ~oject: 616 DeForest Court J Single Family Home~ Coppell, Te~ ~r, zziect Num ..~21148 Sample Information Sample Time: 12:30pm Date Cast: April 25, 2002 Technician: Steve Campbell Weather Conditions: Cloudy Accumulative Yards: 10 Placement Method: Crane & Bucket Sample Locations: Pier 6 Placement Location: Piers 1,2, 3, 4 & 6 Result Specification Test Method 5.50 5-7 ASTM C-143 None 90 ASTM Cl 064 69 ASTM C-1064 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 1 I 6.00 28.27 05/02/2002 7 61,160 2,160 1 2 6.00 28.27 05/02/2002 7 60,940 2,150 Average 2,160 1 3 6.00 28.27 05/23/2002 28 91,410 3,230 1 4 6.00 28.27 05/23/2002 28 87,910 3,110 Average 3,170 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive Technician: Steve Campbell ~k ~~¢' ~~' Report Distribution: HBC Engineering (1) The Holmes Builders Reviewed by: ~ (1) City of Coppell - Constr Insp · - (1) City of Coppell - Bldg Insp Hussein H. Abusaad, P.E. Senior Project Mar~ager The tests were pedorm~ in general accordance with applicable ASTM, ~SHTO, or DOT test methods. This mpod is ~clusiveiy for the use of the client indicat~ above and shall not be reproduced except in full ~thout the wri~en approval of Terracon. Test results tmnsmiff~ herein am only applicable to the actual samples tested at the location(s) refemnc~ and are not necessarily indicative of the pro.Ales of other apparently similar or identical Page 1 of 1 REPORT OF DRILLED PIER OBSERVATION Report Number: 94021181.0003 Service Date: May 14, 2002 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: The Holmes Builders Attn: Terry Holmes 1406 Halsey Way Suite 100 Carrollton TX 75007 Report Date: May 24, 2002 Project: 615 DeForest Court Lot #5 Single Family Home Coppell, Texas Project Number: 94021181 Services: Drilled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier observation. HBC's technician observed the drilling of pier test holes to determine the suitability of the underreamed piers. Technician: Phil Green Report Distribution: H~eering (1) The Holmes Builders Reviewed by: (1) City of Coppell - Constr Insp ~ - E Hussein H. Abusaad, P.. (1) City of Coppell - Bldg Insp Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the propedies of other apparently similar or identical materials. Page 1 of 1 ~. S~-F~.K~y