Deforest Court-LR020517 (2)REPORT OF DRILLED PIER OBSERVATION
Report Number: 94021148.0011
Service Date: May 2, 2002
Client: The Holmes Builders
Attn: Jon DostertJDean Trudeli
1406 Halsey Way Suite 100
Carrollton TX 75007
8901 Carpenter FnNy., Suite #100
~ Dallas, Texas 75247
~ ..
630-1010
Report Date~"~ay 17,f002
Project: c~6 DeForest Court
~le Family H~
Co~
Project Number: 94021148
Services: Drilled pier observation
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
drilled pier observation. See the attached sheet(s) for recorded data.
NOTE: HBC's technician was unable to determine the plumbness of the piers drilled on this date.
Technician: Steve Campbell
Report Distribution:
(1) The Holmes Builders
(1) City of Coppell - Constr Insp
(1) City of Coppell - Bldg Insp
Reviewed by:
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the propedies of other apparently similar or identical
materials.
Page 1 of 1
REPORT OF DRILLED PIER OBSERVATION
Report Number: 94021148.0009
Service Date: May 1, 2002
ENGINEERING
8901 Carpenter Fn~/y., Suite #100
Dallas, Texas 75247
(214) 630-1010
Client: The Holmes Builders
Attn: Jon DosterlJDean Trudell
1406 Halsey Way Suite 100
Carrollton TX 75007
Report Date: May 17, 2002
Project: 616 DeForest Court
Single Family Home
Coppell, Texas
Project Number: 94021145
Services: Drilled pier observation
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
drilled pier observation. See the attached sheet(s) for recorded data.
Technician: Steve Campbell
Report Distribution:
(1) The Holmes Builders
(1) City of Coppell - Constr Insp
(1) City of Coppell- BIdg Insp
Reviewed by:
HBC En ineering
Hussein Iq. Abusaa , . .
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1 ~w~,~