Loading...
Deforest Court-LR020517 (2)REPORT OF DRILLED PIER OBSERVATION Report Number: 94021148.0011 Service Date: May 2, 2002 Client: The Holmes Builders Attn: Jon DostertJDean Trudeli 1406 Halsey Way Suite 100 Carrollton TX 75007 8901 Carpenter FnNy., Suite #100 ~ Dallas, Texas 75247 ~ .. 630-1010 Report Date~"~ay 17,f002 Project: c~6 DeForest Court ~le Family H~ Co~ Project Number: 94021148 Services: Drilled pier observation On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier observation. See the attached sheet(s) for recorded data. NOTE: HBC's technician was unable to determine the plumbness of the piers drilled on this date. Technician: Steve Campbell Report Distribution: (1) The Holmes Builders (1) City of Coppell - Constr Insp (1) City of Coppell - Bldg Insp Reviewed by: Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the propedies of other apparently similar or identical materials. Page 1 of 1 REPORT OF DRILLED PIER OBSERVATION Report Number: 94021148.0009 Service Date: May 1, 2002 ENGINEERING 8901 Carpenter Fn~/y., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: The Holmes Builders Attn: Jon DosterlJDean Trudell 1406 Halsey Way Suite 100 Carrollton TX 75007 Report Date: May 17, 2002 Project: 616 DeForest Court Single Family Home Coppell, Texas Project Number: 94021145 Services: Drilled pier observation On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier observation. See the attached sheet(s) for recorded data. Technician: Steve Campbell Report Distribution: (1) The Holmes Builders (1) City of Coppell - Constr Insp (1) City of Coppell- BIdg Insp Reviewed by: HBC En ineering Hussein Iq. Abusaa , . . Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ~w~,~ o o ~