Loading...
PA0001-CS020528T H E • C 1 T Y O F f • May 28, 2002 Byron Lowe ACC, Inc. 821 E. Southlake Blvd. Southlake, TX 76092 RE: MacArthur Park PA 00-01 Dear Mr. Lowe: Inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, February 16 and Saturday, February 23, 2002. The overtime rate including salary and benefits is $40.00 per hour. Four hours were charged to your company on each of those dates. Copies of the overtime payment due notification letters are attached. Payment of inspector overtime is required before final acceptance of the project by the City of Coppell. Please send a copy of this letter along with your check for $320.00, payable to the City of Coppell to the following address: City of Coppell Finance Department Attn: Jennifer Armstrong, Finance Director P.O. Box 9478 Coppell, TX 75019 If you should have any questions, please contact me at (972) 304 -3679. Sincerely, Rick O'Dell Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: Finance Department Rhonda Brothers, Engineering Secretary 255 PARKWAY * P.0.80X 478 * COPPELL TX 75019 * TEL 9721462 0022 * FAX 972/904 3673 DEVELOPMENT FEES PROJECT NAME: PA00.01 MacArthur Park ENGINEER: ORIGINATION DATE: 07/03/2000 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee Water Impact Fee Wastewater Impact Fee Prior To Construction Erosion Control Approved E.P.A.- N.0.1. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. Street Sign Street Light notify street dept. Construction Inspection 07/03/2000 Overtime Inspection $120.00 $120.00 07/13/2000 02/04/2002 Overtime Inspection $160.00 $160.00 03/04/2002 02/18/2002 Overtime Inspection $160.00 $160.00 06/04/2002 02/25/2002 Overtime Inspection $160.00 $160.00 06/04/2002 03/04/2002 Overtime Inspection $80.00 $8U. ) 04/09/2 03/11/2002 Overtime Inspection $160.00 $160.00 04/09/2002 03/18/2002 Overtime Inspection $80.00 $80.00 04/09/2002 03/25/2002 Overtime Inspection $120.00 $120.00 04/15/2002 04/08/2002 Overtime Inspection $160.00 $160.00 05/24/2002 Total Fees Fees Paid Amount Owed TOTALS $1,200.00 $1,200.00 $0.00 Prior To Construction Erosion Control Approved E.P.A.- N.0.1. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. l Prepared by J.E. NO._____ Approved by POSTED BY: FUND: DATE DATE: DESCRIPTION ACCOUNT NUMBER DR. CR. acLs p1 - /(40,00 s.j moOo tz% 45ci /&C.00 GC Pt c is Prepared by Approved by FUND J.E. N0._____ POSTED BY: DATE: DATE: DESCRIPTION ACCOUNT NUMBER DR. CR. -� 0 40 Pt c CITY OF COPPELL JOURNAL ENTRY CITY OF COPPELL JOURNAL ENTRY