Loading...
ST9904-CS020208Mar 19 02 11:O5a Texas Department of Transportation ITS, Inc. 972-484-4545 TxDOT SH 121 TASK FORCE REPORT Note: Section numbers in narrative below correspond to numbers on drawings l~vbary-13,.3QG1 T. COMPLETED PROJECTS p.2 Ti2~cY ~tL~ ~v ST9~-oy Section From To Description Date Completed 1 Tarrant CL Denton CR 4-lane ML w/ 2-lane FR Jul 1992 2 Denton CR IH 35E 4/G lane divided highway I~ov 1993 '~ IH 35B FM 1171 6-lane divided highway .iun 1991 4 FM 11 ~ 1 Elm Fork 6-lane divided highway Jul 1988 5 Elm Fork BNRR 4-lane divided highway Feb 1994 ~B ~ Crider Road FM 423 Eliminate intersection Sep 1995 6 7 BNRR Legacy Legacy SH 289 4-lane divided highway 4-lane divided highway Mar 1994 May 1995 9 Denton CR Benton Tap Road BP: 3-lane frontage roads Oci 1998 10 'Denton Tap Road Lake Vista BP: 3-lane frontage roads Jul 1988 1 ~ Lake Vista - IH 35E BP: 3-lane frontage roads _ Jun 1996 12~ IH 35E FM 544 BP: 3-lane frontage roads Oct 1999 ~ II. DENTON COUNTY PROJECTS A. Section 13: Tarraut County Line to North of Denton Creek (conversion to freeway)(CSJ 0364-02-017 & 0364-03-064) The Texas Transportation Commission at their July 2001 meeting under the Innovative Financing Program advanced this project to Priority 1 in Category 3A -NHS Mobility. 2. Estimated Construction Costs: CSJ COUNTY FROM TO Length COST 2002 L'TP STATUS 0364-02-017 Dallas Tarrant CL Denton CL 1.728 $51,000,000 Priority 1 03G4-03-OG4 Denton Dallas CL Denton Crk 0.300 $ 9,100,000 Priority 1 Total $G0,100,000 __ 3. TxDOT's Fort Wo~•th District is including this section of the SH 121 Free- way in an ongoing MIS, Schematic, and EA consultant contract they have in the area. The Fort Worth District is working closely with the City of Grapevine to develop the transportation needs in the area. The following are estimated milestone dates: Page 1 of 3 Uodate3: 02/06/02 d:23 AM Mar 19 02 11:06a ITS, Inc. 972-484-4545 P•3 (-- DESCRIPTION ~ ESTIMATED DATE ~ 1~1IS ~ Public Meeting: Preliminary Schematic and EA findings presented. ~ 1ul~y 2UOZ ~ I Public Hearing: Final Schematic and Final EA presented. Ear1~ 2003 4 The Public Meeting and Hearing dates have been pushed back to allow the consultant to address Grapevine and Coppell ramp location concerns. Attstin on the Grape- B. Section 14: Existing SH 121 Near Denton Creek to Existing SH 121 Near FM 544 (Lewisville Bypass)(Mainlanes)(CSJ 3547-03-003, 3547-02-004, 3547- 01-005,3547-01-008, & 3547-O1-009) The Texas Transportation Commission at their July 2001 meeting under the Innovative Financing Program advanced these projects to Priority 1 in Category 3A -NHS Mobility. 2. Estimated Construction Costs: e~. \~ ~° CSJ Designer County FROM TO Length COST 3547-03-003 Denton Co - Halff Denton SH 121 Dallas CL 0.500 $ 5,834,249 3547-02-004 Denton Co - Halff Dallas Denton CL Denton CL 1.800 $13,360,541 3547-01-005 Denton Co - Halff Denton Dallas CL Lake Vista 1.085 $ 8,273,427 3547-OI-008 3547-01-009 Denton Co - Halff Denton Co - C&B Denton Denton Lake Vista Hebron IH 35E FM 544 0.730 3.432 $49,062,175 $34,365,141 Total $110,895,533 C. Section 15: Denton County Portion: FM 544 to DNT Bridgefarmer Design The Texas Transportation Commission at their July 2001 meeting under the Im~ovative Financing Program advanced these frontage road projects to Priority 1 in Category 3A -NHS Mobility. 2. These mainlanes will be funded with a combination of local funds and funding from the North Central Texas Council of Govet7~ments (NCTCOG). Page 2 of 3 apdaCed: oa/Ua/02 8:23 AC9 Mar 19 02 11:06a ITS, Inc. 972-484-4545 p•4 3. Construction Costs: CSJ County FROM TO Length COST 2002 UTP STATUS i 0364-03-066 Deuton FM 544 Collin CL 4.947 $54,609,ZZ7 Priority 1 0364-04-038 Collin Denton CL DNT 0.982 $11,188,588 Priority 1 - Total $65,797,815 III. COLLIN COUNTY PROJECTS A. Section 15: Collin County Portion: DNT to US 75 1. Project Under Constnuction: CSJ County FROM TO Length COST LETTING DATE 0364-04-023 # Collin DNT Interchange $31,000,000 11-27-2001 Total $31,OOQ000 # NTTA project with joust Yunding: N'1'"1'A = ~ 1 l.yM; 1 xllU1 = ~ u.1M. Note: The Minute Order allowing the NTTA to construct the DNT Interchange was executed by the Texas Transportation Commission at its Maz-ch 2001 meeting. 2. Current Design Projects (see ~ddtional,llfort~~tio~ attaelt~d): CSJ Cotmty FROM T`O Length: CC)S'T I:ET'I'TNG DATE 0364-04~022,A (FR) Collin DN'T Custer S.20U Q4-2003 0364-~4-037 (1vTT.) Collin Di~1T 5~1~8~ 1.51 $13~Ci(10,060 04-2003 036.4-04=022B (FR) Collin Coster US 75 5.701) IO-2002 'T'otal $80~525;Od9 3. Future Project: CSJ County FROM TO Length COST 0364-04-024 (ML) Collin SH 289 US 75 9.059 $57,530,000 Total $57,530,000 Page 3 of 3 Updated: 02/09/02 8:23 AM