Loading...
ST9304-CS020517From: To: Date: Subject: Teresa Turner Brent Adams 5/17/02 2:18:20 PM Power Source for Temporary Signal Brent - have you had a chance to check on this? Brent: John Mears with Dallas County believes he spoke with you about this issue a while ago. The power source for the temporary signal at Moore/Beltline is on a power pole that needs to be removed for the project. Would you have an opportunity to see if the power source can be removed from the pole without having any impact on the signal operation? John seemed to think that it could be disconnected and left hanging there. Let me know what you think. Thanks. Teresa