SW0001-CS020520WEEKLY PROJECT STATUS REPORT
DATE:
CLIENT:
PROJECT:
May 20 - May 24, 2002
City of Coppell
Riverchase Elementary School
PROJECT NO.:
BY:
REVIEWED BY:
2230-01.148
Bradley J. Moss
Steve A. Markussen
Date
05/20
05/21
05/22
05/23
CC:
Item
1. BJM called Suzan Taylor to verify if sidewalk will be constructed before Starleaf.
2. BJM called Mr. Millican in regards to the revisions of his paving design.
1. Suzan called BJM and requested that he call Shannon Gray for the status of the TXU
approval of easement. BJM made the call, and Shannon stated that engineers are in the
process of reviewing the plans and he will contact BJM when finished.
2. Suzan called and stated that sidewalk will be construction before Starleaf will.
3. BJM received City comments from the sidewalk easement documents.
1. BJM sent revised easement documents to Suzan Taylor.
Mike Millican called and stated that Aguirre's new surveyed elevations of Starieaf were a
tenth higher than PK's, and he felt confident with PK's elevations, so he will revise his
roadway plans and send them to BJM by 05/28/02.
City of Coppell - Kenneth Griffin
BJM/slt
2230-21