Loading...
ST9905-CS020131ary o nson - et a oa ramage- evise osts age From: DL-Paul Padilla <pjpadilla@transystems.com> To: "'kgriffin@ci.coppell.tx.us"' <kgriffin@ci.coppell.tx.us> Date: 1/31/02 4:22PM Subject: Bethel Road Drainage-Revised Costs Please find the attached spread sheet which summarizes what we have done to date. Please call me and I will go over it with you. It can get confusing «cost estimate.xls» Paul J. Padilla, P.E. 3010 LBJ Freeway, Suite 990 Dallas, TX 75234 (972)280-9300 (972)280-9715 fax pjpadilla@transystems.com Pro osed O en Channel From Free ort to Bethel RD with LISPS AND DFW DETENTION Precast Concrete Stone Channel Linin SF 15200 $ 75.00 $ 1,140,000.00 Excavation CY 7740 $ 10.00 $ 77,400.00 Gredi LS 1 $ 1,000.00 $ 1,000.00 Seeding LS 1 $ 500.00 $ 500.00 SUBTOTAL 1,218,900.00 Pro osed O en Channel 200 FT Downstream From Co ell RD w Precast Concrete Stone Channel Linin SF ith LISPS 3200 AND DFIN DETEN $ 75.00 TION $ 240,000.00 Excavation CY 1830 $ 10.00 $ 16,300.00 Gredin LS 1 $ 500.00 $ 500.00 Seeding LS 1 $ 250.00 $ 250.00 SUBTOTAL $ 257,050.00 Pro osed O en Channel Min arils Pros th Detention Im rovemenls on Both Pro erties Precast Concrete Stone Channel Linin SF 27720 $ 75.00 $ 2,079,000.00 6.10' x 5' Box Culvert 60' each Box LF 380 $ 350.00 $ 128,000.00 Headwall /Win wall EA 2 $ 4,500.00 $ 9,000.00 Remove Existin Box Culvert Concrete Pavement (6" Cement Treated Base 9' CY SY SY 4533 535 535 $ 18.00 $ 35.00 $ 1.55 $ 81,594.00 $ 18,725.00 $ 829.25 Rertwve Concrete Pavement SY 535 $ 15.00 $~ 8,025.00 6" Concrete Curb and Gutter LF 120 $ 20.00 $ 2,400.00 Excavation CV 16133.3 $ 10.00 $ 161,333.00 Gredin for New Culvert LS 1 $ 3,000.00 $ 3,000.00 Seeding LS 1 $ 6,000.00 $ 8,000.00 SUBTOTAL $ 2,495,908.25 Detentlon Pond 7 on DFW Pro e Excavation for Pond 87.44 ac-ft CY 141070 $ 10.00 $ 1,410,700.00 Seedin LS 1 E 1,500.00 $ 1,500.00 Outet Structure LS 1 $ 20,000.00 $ 20,000.00 Greding LS 1 $ 2,500.00 $ 2,500.00 SUBTOTAL $ 1,434,700.00 Detention Pond 2 on DFW Pro e Excava8on for Pond 47.95 ac-ft CY 77359 $ 10.00 $ 773,590.00 Seedin LS 1 $ 1,500.00 $ 1,500.00 Outlet Structure LS 1 $ 25,000.00 $ 25,000.00 Greding LS 1 $ 2,500.00 $ 2,500.00 SUBTOTAL $ 802,590.00 La a LISPS Pond Excavation for Pond 26.18 ac-ft CY 42237 $ 10.00 $ 422,370.00 Seedin LS 1 $ 1.500.00 $ 1,500.00 Outlet Structure LS 1 $ 20,000.00 $ 20,000.00 Grading LS 1 $ 2,500.00 $ 2,500.00 SUBTOTAL $ 448,370.00 USPSIMI aril Pond Excavation for Pond 19.28 ac-ft CY 31072 $ 10.00 $ 310,720.00 Seedi LS 1 $ 1,500.00 $ 1,500.00 OuBet Structure " LS 1 $ 20,000.00 $ 20,000.00 Grading LS 1 $ 2,500.00 $ 2,500.00 SUBTOTAL $ 334,720.00 Pro ed CuNaR Im rovement at Co II Road and Gre evine Creek 4-10'x7' Box Culvert 50' each Box LF 200 $ 800.00 $ 160,000.00 Headwall !Win all EA 2 $ 8,500.00 $ 17,000.00 Remove Existin Box Culver! CY 150 $ 18.D0 $ 2,700.00 As halt Pavin 4" TON 49 $ 500.00 $ 24,500.00 Cement Treated Base (9" SY 225 $ 1.55 $ 348.75 Rertave ExisU As halt Pavement SY 225 $ 1.00 $ 225.00 Gredi for New Culvert LS t $ 3,000.00 $ 3,000.00 Seeding LS 1 $ 300.00 $ 300.00 SUBTOTAL $ 208,073.75 Pro sect CuNart Im rovement at Bethel Road and Gra evine Creek 3-10' x 8' Box Culvert 30' each Box LF 90 $ 750.00 $ 67,500.00 Headwall! Win all EA 2 $ 7,500.00 $ 15,000.00 Remove Existin Box Culvert CY 90 $ 18,00 $ 1,620.00 As haft Pavin 4' TON 30 $ 500.00 $ 15,000.00 Cement Treated Base 9" SY 140 $ 1.55 $ 217.00 Renave Existin As haft Pavement SY 140 $ 1.00 $ 140.00 GreUi for New CulveR LS 1 $ 3,000.00 $ 3,000.00 Seeding LS 1 $ 300.00 $ 300.00 SUBTOTAL $ 102,777.00 Total $ 8,103,517.00 15% Contingency $ 1,215,527.55 Grand Total $ 9,319,044.55 Grass Lined Options in Lieu of Pavestone Lined Total $ 3,894,517.00 15%CoMingency $ 584,177.55 Grand Total $ 4,478,694.55 28511f 420/cyd 309225 $ 830,775.00 203775 $ 548,225.00 57000 $ 183,000.00 564300 $ 1,514,700.00 $ 3,074,700.00 $ 5,028,817.00 15% Contingency $ 754,322.55 Grand Total $5,783,139.55 .67cydltoot