Loading...
ST9905-CS020524 5T ..9.9 - 05 A~.IIE8 "~ ~G~JRS May 24, 2002 Ms. Susan Taylor City ofCoppell Public Works 732 DeForest Rd Coppell, IX 75019 Subject: 745762-01-74-01-00 Bethel Road Improvements Touch America, Inc Facility Lowering Dear Ms. Taylor, POWER Engineers, Inc on behalf of Touch America, Inc has review the plans for the Bethel Road project. Enclosed please fmd a set of proposed construction plans for adjusting existing Touch America, Inc facilities to avoid conflicts with the City of Coppell' s improvement project. The proposed plans reflect the areas of improvement for Bethel Road as well as the lowering of Touch conduits. Touch America, Inc has (2)2" HDPE conduits in place outside' the existing Bethel roadway. Please let us know if these plans are acceptable so that we may coordinate to have the facilities lowered prior to the City's contractors beginning the Bethel Road project. If! can provide any additional information or if you have any questions feel free to contact me at the office at 303-716-8903. Thanks for your time. Sincerely, POWER Engineers, Inc. Alex Abeyta AlA/a cc: File: 745762-01-74-01-00 Marc Paflhausen - (Touch America, mc wi enclosures) GFisher (POWER wi Enclosures) POWER Engin~W.l"dilll8Afted . ........., '.~"'iH+2+!V'0mfW"'1W$$l$ fir 3900 South Wadsworth Boulevard, Suite 700 Lakewood, CO 80235 Phone (303) 716-8900 Fax (303) 716-8980