Loading...
ST0001-LR020520RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630=9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 05/20/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEMENT OATE: 04/19/2002 WEATHER CONDITIONS: Clear TIME SAMPLED: 7:05am BATCH TIME: 6:02am TEMPERATURE (F) - AIR 80 F CONCRETE: 90 F TRUC~: NO: 1045 TICKET NO: 7115618 AIR CONTENT (%): 3.5 UNIT WEIGHT (pet): NA OVERALL PLACEMENT LOCATION: Paving - Creekvinw, south lane eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: REPORT OF TESTS 35' cast x 5' south of northwest comer of paving, south lane · ' 6" 12" (area 28.27 sq. in.) Concrete Compressive Cylinder x CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs, force) (psi) TYPE 1 1 2.5 04/22/2002 3 90975 3220 Unbonded Cap 1 2 2.5 04/26/2002 7 98990 3500 Unbonded Cap 1 3 2.5 05/17/2002 28 130025 4600 Unbonded Cap 1 4 2.5 05/17/2002 28 133440 4720 Unbonded Cap Average 4660 1 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, inc. 01DK Page 1 of 18 Report No.: 148080 RoneEngineers Project No.: 015729 Client: City of Coppell m'~m~l CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed end shall not be reproduced except in fi~ll without the written approval of Rone Engineers, Inc. 01DK Page 2 of 18 Ro =gineers 8908 Ambassador Row Dallas, Texas 752474510 (214) 630-9745 (214) 6309819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 05/20/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lat~imore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEMENT DATe: 04/19/2002 WEATHER CONDITIONS: CleRr TIME SAMPLED: 8:40am BATCHTIME: 8:06am TEMPERATURE (F)- AIR 82 F CONCRETE: 90 F TRUCK NO: 938 TIEK]ETNO: 7115627 AIR CONTENT (%): 4.5 UNIT WEIGHT (per): NA OVERALL PLACEMENT LOCATION: Paving - Creekview, south lane eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 2+00 REPORT OF TESTS Coner~e Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 2.5 04/22/2002 3 91245 3230 Unbonded Cap 2 2 2.5 04/26/2002 7 108370 3830 Unbonded Cap 2 3 2.5 05/17/2002 28 133440 4720 Unbonded Cap 2 4 2.5 05/17/2002 28 128495 4540 Unbonded Cap Average 4630 2 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 3 of 18 Report No.: 148080 RoneEn~ine~e~ Project No.: 015729 Client: City of Coppell ............. CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 4 of 18 RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 05/20/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: Co~rraACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEM~fr DATE: 04/19/2002 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 10:30am BATCH TIME: 9:02am TEMPERATURE (IF) - AIR 82 F CONCRETE: 90 F TRUCK NO: 1093 TICKET NO: 7115637 AIR Cot*rENT (%): 4.25 UNITWEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Paving - Creekview, south lane eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 3+75 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE 3 1 2.25 04/22/2002 3 80015 2830 UnbondedCap 3 2 2.25 04/26/2002 7 90835 3210 Unbonded Cap 3 3 2.25 05/17/2002 28 111115 3930 Unbonded Cap 3 4 2.25 05/17/2002 28 113320 4010 Unbonded Cap Average 3970 3 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, linc. 01DK Page $ of 18 Report No.: 148080 RoneEngineers Project No.: 015729 Client: City of Coppell t~l CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written appwval of Rone Engineers, Inc. 01DK Page 6 of 18 RoneEngineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell ARm Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 05/20/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTaACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEM~rr DATE: 04/19/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: ] :20pm BATCH TIME: 12:41pm TEMPERATURE (F) - AIR 85 F CONCRETE: 90 F TRUCl< NO: 1106 TIC~T NO: 3143432 AIR CONTENT (%): 4.0 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving - Crcekview, south lane eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 5+25 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 2.5 04/22/2002 3 92295 3260 Unbonded Cap 4 2 2.5 04/26/2002 7 100175 3540 Unbonded Cap 4 3 2.5 05/17/2002 28 132590 4690 Unbonded Cap 4 4 2.5 05/17/2002 28 129750 4590 Unbonded Cap Average 4640 4 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conh'ol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in flail without the written approval of Rone Engineers, Inc. 01DK Page 7 of 18 Report No.: 148080 Rone£ngineers Project No.: 015729 Client: City of Coppell CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 8 of 18 Ro gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 05/20/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP On): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C- 172 ASTM C-3 ! ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLAC~M~rr OATS: 04/19/2002 WEATHER CONDITIONS: Partly cloudy TIM~ SAMPLEO: 2:35pm BATCH TIM~: 1:57pm TEMPERATURE (F} - AIR 85 F CONCRETE: 92 F TRUCKNO: 757 TICK~TNO: 7115666 AIR CONTENT (%): 4.75 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving - Creek:view, south lane eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 7+60 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 2.0 04/22/2002 3 94700 3350 Unbonded Cap 5 2 2.0 04/26/2002 7 105295 3720 Unbonded Cap 5 3 2.0 05/17/2002 28 121875 4310 Unbonded Cap 5 4 2.0 05/17/2002 28 124890 4420 Unbonded Cap Average 4370 5 5 Hold LIMITATIONS: The test results presented hem-in were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 9 of 18 Report No.: 148080 RoneEngineers Project No.: 015729 Client: City of Coppell I~mm~l CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for thc exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 10 of 18 RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 05/20/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of frenh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back m the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3%-5% ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEME~rr OATE: 04/19/2002 WEATHER CONDITIONS: Clear TIME SAMPLED: 4:35pm BATCH TIMr: 2:1 lpm TEMPERATURE CF} - AIR 86 F CONCRETE: 90 F TRVC~: NO: 973 T~Cr.~T NO: 7115670 AIR CONTENT (%): 4.0 UNIT WEIGHT (pc/}: NA OVERALL PLACEMENT LOCATION: Paving - Creekview, south lane eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 9+30 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE 6 1 2.5 04/22/2002 3 80170 2830 Unbonded Cap 6 2 2.5 04/26/2002 7 99385 3510 Unbonded Cap 6 3 2.5 05/17/2002 28 128975 4560 Unbonded Cap 6 4 2.5 05/17/2002 28 126845 4490 Unbonded Cap Average 4530 6 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK ]Page 11 of 18 Report No.: 148080 RoneEngineers Project No.: 015729 Client: City o£Coppell I~l CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 12 of 18 ROneEn glneers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9g19 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell At~: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 05/20/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at thc placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. 'CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days T~ - 5" 3%-5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEMENT DATE: 04/19/2002 WEATHER CONDITIONS: Partly cloudy TI~mStaV~PLED: 4:lSpm BATCHTIM~: 2:45pm TEMPERATURE (F) - AIR 85 F CONCRETE: 90 F TRUCK NO: 1050 TlCm~T NO: 3143452 AIR CONTENT (%): 4.25 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Paving - Creekview, south lane eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 10+75 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (ama 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE 7 1 2.25 04/22/2002 3 85250 3010 Unbonded Cap 7 2 2.25 04/26/2002 7 96920 3430 Unbonded Cap 7 3 2.25 05/17/2002 28 115475 4080 Unbonded Cap 7 4 2.25 05/17/2002 28 119415 4220 Unbonded Cap Average 4150 7 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 13 of 18 Report No.: 148080 RoneEngineers Project No.: 015729 Client: City of Coppell mmm~Wl CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE Water added at site: 10 9allons LIMITATIONS: The test resuRs presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed end shall not be reproduced except in full without the wriften approval of Rone Engineers, Inc. 01DK Page 14 of 18 RoneEn gil 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 650-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 05/20/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACrOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEMENT DATE: 04/19/2002 WEATHER CONDrrIoNS: Partly cloudy TIME SAMPLED: 5:15pm BATCH TIME: 4:19pm TEMPERATURE (F} - AIR 85 F CONCRETE: 90 F TRUCKNO: 746 TIC~:~Tr~O: 6173396 AIR CONTENT (%): 4.5 UNIT WEIGHT (pet): NA OVERALL PLACEMENT LOCATION: Paving - Creekview, south lane eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 12+60 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 8 1 2.5 04/22/2002 3 89680 3170 Unbonded Cap 8 2 2.5 04/26/2002 7 103795 3670 Unbonded Cap 8 3 2.5 05/17/2002 28 122140 4320 Unbonded Cap 8 4 2.5 05/17/2002 28 122440 4330 Unbonded Cap Average 4330 8 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 15 of 18 Report No.: 148080 RoneEn~lineers Project No.: 015729 Client: City of Coppell I~nm~l CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE LIMITATIONS: The test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, lac. 01DK Page 16 of 18 RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247.-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 05/20/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACE~VmNT DATE: 04/19/2002 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 6:05pm BATCH TIMe: 5:17pm TEMPERATURE (F) - AIR 86 F CONCRETE: 90 F TRUCI~ NO: 1118 TICr,~T NO: 6173407 AIR CONTENT (%): 4.0 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Paving - Crcekview, south lane eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 14+55 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 9 1 2.0 04/22/2002 3 85235 3010 Unbonded Cap 9 2 2.0 04/26/2002 7 102765 3630 Unbonded Cap 9 3 2.0 05/17/2002 28 127005 4490 Unbonded Cap 9 4 2.0 05/17/2002 28 127320 4500 Unbonded Cap Average 4500 9 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 17 of 18 Report No.: 148080 RoneEngineers Project No.: 015729 Client: City of Coppell m'm~mmWl CYLINDER MEASURED MARKED SLUMP SET NO. (inches) Technician: Anthony Maldonado Report Distribution: (1) City of Coppell (!) City of Coppell (1) City of Coppell (1) Infi-astmcture Services, Inc. MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH FRACTURE TESTED (days) Obs. force) (psi) TYPE Started: 6:00am Finished: 8:30pm (1) City of Coppell (1) Schdckcl, Rollins & Assoc., Inc. Project Mabhger LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whore they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 18 of 18