Loading...
ST0001-LR020522 8908 Ambassador Row Dallas, Texas 75247-4510 RoneEngineers (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Project~ ~'-T~ .acT. z A P,~way -- Copp¢II, TX Services: Report No.: 148255 Project No.: 015729 Date of Service: 04/23/2002 Report Date: 05/22/2002 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Latfimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEMENT DATE: 04/23/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 8:00am BATCH TIME: 7:15am TEMPERATURE {F)-AIR 63 F CONCRETE: 78 F TRUC~: NO: 758 TICm~T NO: 7115705 AIR CONTENT (%): 4.1 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Paving fi'om Station 17+50 to Station 26+50 (Creekview) south lane eastbound SAMPLE LOCATION: Station 18+50 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MARKED SET NO. 1 1 2.0 1 2 2.0 1 3 2.0 I 4 2.0 MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) Obs. force) 04/26/2002 3 86655 04/30/2002 7 91305 05/21/2002 ~'~ ) 127990 05/21/2002 V 113270 Average 1 5 Hold COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3060 Unbonded Cap 3230 Unbonded Cap nbonded Cap nbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ibc. 01DK Page I of 8 Report No.: 148255 Project No.: 015729 Client: City of Coppell CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Oar letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, lfic. 01DK Page 2 of 8 RoneEngineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148255 Project No.: 015729 Date of Service: 04/23/2002 Report Date: 05/22/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" o 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEMENT DATE: 04/23/2002 WEATHER CONmTIONS: Partly cloudy TIME SAMPLED: 10:15am BATCHTIME: 9:47am TEMPERATURE (F) - AIR 70 F CONCRETE: 90 F THUCK NO: 1039 TICm~T NO: 7115725 AIR CONTENT (%}: 4.0 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Paving fi'om Station 17+50 to Station 26+50 (Creekview) south lane eastbound SAMPLE LOCATION: Station 21+50 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 2.0 04/26/2002 3 92755 3280 Unbonded Cap 2 2 2.0 04/30/2002 7 103700 3670 Unbonded Cap 2 3 2.0 05/21/2002 28 125005 4420 Unbonded Cap 2 4 2.0 05/21/2002 28 121370 4290 Unbonded Cap Average 4360 2 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~ll without the written approval of Rone Engineers, Inc. 01DK Page 3 of 8 Report No.: 148255 Project No.: 015729 Client: City of Coppell RoneEngineers CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE LIMITATIONS: The test results presented herein were prepared based upon the specific samples pmvided for testing. Wc assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters.and reports are for the exclusive usc of the clients to whom they are addressed and shall not be reproduced except in full without the w'~itten approval of Rone Engineers, Inc. 01DK Page 4 of 8 gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148255 Project No.: 015729 Date of Service: 04/23/2002 Report Date: 05/22/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEMENT OATE: 04/23/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: ll:40am BATCHTIME: ll:02am TEMPERATURE (F) - AIR 71 F CONCRETE: 90 F TRUCK NO: 1039 TICRET NO: 7115737 AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving fi'om Station 17+50 to Station 26+50 (Creekview) south lane eastbound SAMPLE LOCATION: Station 23+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 2.5 04/26/2002 3 75595 2670 Unbonded Cap 3 2 2.5 04/30/2002 7 86515 3060 Unbonded Cap 3 3 2.5 05/21/2002 28 111670 3950 Unbonded Cap 3 4 2.5 05/21/2002 28 107915 3820 Unbonded Cap Average 3890 3 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters ~and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the whtten approval of Rone Engineers, Inc. 01DK Page 5 of 8 Report No.: 148255 Project No.: 015729 Client: City of Coppell RoneEngineers CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, [~c. 01DK Page 6 of 8 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148255 Project No.: 015729 Date of Service: 04/23/2002 Report Date: 05/22/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEMEnt OATE: 04/23/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 1:45pm BATCH TIMr: 1: 18pm TEMPERATURE (F) - AIR 80 F CONCRETE: 90 F TRUCKNO: 1092 TlC~a~TNO: 7115755 AIR CONTENT (%): 4.1 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Paving from Station 17+50 to Station 26+50 (Creekview) south lane eastbound SAMPLE LOCATION: Station 25+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 2.25 04/26/2002 3 62970 2230 Unbonded Cap 4 2 2.25 04/30/2002 7 75120 2660 Unbonded Cap 4 3 2.25 05/21/2002 28 101035 3570 Unbonded Cap 4 4 2.25 05/21/2002 28 100905 3570 Unbonded Cap Average 3570 4 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples pmvided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use offue clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ibc. 01DK Page 7 of 8 Report No.: 148255 Project No.: 015729 Client: City of Coppell ROneEngineers CYLINDER MEASURED MARKED SLUMP SET NO. (inches) DATE TESTED AGE (days) MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE Water added at site: 5 9allons Technician: Anthony Maldonado Report Distribution: (1) City of Coppell (1) City of Coppell (1) City of Coppell (I) Infrastructure Services, Inc. Started: 9:00am Finished: 4:30pm (1) City of Coppell (i) Schrickel, Rollins & Assoc., lac. Clay S~ rk Project Manager LIMITATIONS: The test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, ibc. 01DK Page 8 of 8 RoneEn 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax} CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppeil Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 149754 Project No.: 015729 Date of Service: 05/14/2002 Report Date: 05/22/2002 Project:~ --Freeport Parkway Coppell, TX Services: Obtain samples oftYesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for caring and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 6 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 3"- 5" 3% - 5% ASTM C- 172 ASTM C-3 l ASTM C- 143 ASTM C-231 ASTM C- 1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 05/1 4/2002 WEATHER CONDITIONS: Clear TIME SAMPLED: 8:50am BATCH TIME: 7:59am TEMPERATURE (F)-AIR 65 F CONCRETE: 85 F TRUCK NO: 761 TICKET NO: 617486 AIR CONTENT (%): 4.25 [INIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving - west side approachment and State Road intersection going into west parking lot of Wagon Wheel baseball park SAMPLE LOCATION: REPORT OF TESTS 10' north x 8' east of southwest corner of intersection · ' r "x 12" Concrete Compresstve Cyhnde 6 (area 28,27 sq. in.) CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 I 3.0 05/17/2002 1 2 3.0 05/21/2002 I 3 3.0 06/11/2002 1 4 3.0 06/l 1/2002 28 MAXIMUM COMPRESSIVE AG E LOAD STRENGTH FRACTURE (day.~ (lbs. force) :~l~*) TYPE  100485 550 Unbonded Cap 113220 ~ Unbonded Cap Unbonded Cap Unbonded Cap I 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility Ibr variation in quality (composition, appearance, perlbrmance, etc.) or any other Ii:attire of similar subject matter provided by persons or conditions over which we have no control. Oar letters and reports are lbr the exclusive use of the clients to wbom they are addressed and shall not be reproduced except in tull without the written approval ofRone Eagmeers. lac. 01DK Page I of 2 Report No.: 149754 Project No.: 015729 Client: City of Coppell Water added at site: 10 gallons Standby from 10:30 Technician: Anthony Maldonado Report Distribution: (l) City of Coppell (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. to 12:00 waiting for concrete. Started: 7:30am' Finished: 12:30pm (1) City of Coppell (1) Schfickel, Rollins & Assoc., Inc. Rone E~ Clay Sta Project Manager LIMITATIONS: The test results preseuted herein were prepared based upon the specific samples provided for testing. We assume no responsibility lbr variation in quality (compositioa, appearance, pertbmlance, etc.) or any other tEature of similar subject matter provided by persons or condilions over which we have uo control. Our letters and reports are lbr the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers. Inc. 01DK Page 2 of 2