Loading...
ST0001-LR020524 (2)RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST CHent: Project: Services: City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 149973 Project No.: 015729 Date of Service: 05/16/2002 Report Date: 05/24/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLaCEMeNT DATE: 05/16/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 12:30pm BATCHTIME: ll:49am TEMPERATURE (l~ - AIR 70 F CONCRETE: 90 F TRUCK NO: 1040 TICKET NO: 7116679 AIR CONTENT (¥0): 4.25 UNIT WEIGaT ~cO: NA OVERALL PLACE1VIENT LOCATION: Paving - State Street (median center) mm into west parking lot of Wagon Wheel Baseball Park SAMPLE LOCATION: REPORT OF TESTS 15' south x 2' east of apex of median center Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 3.0 1 2 3.0 1 3 3.0 1 4 Technician: Alltholly Maldonado Report Distribution: (1) City of Coppell (I) City of CoppeL1 (1) City of Coppell (1) hfi'astmcture Services, Inc. MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH FRACTURE TESTED (days) (lbs. force) (psi) TYPE 05/23/2002 7 109555 06/13/2002 28 06/13/2002 28 Hold Started: 12:00pm Finished: 3:00pm (1) City of Coppell (1) Schfickel, Rollins & Assoc., Inc. 3870 Unbonded Cap Unbonded Cap Unbonded Cap Clay S~arl~ /~Project Mmag~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Roan Engineers, Inc. 01DK Page 1 of 1 RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Creekview Drive and Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 150182 Project No.: 015729 Date of Service: 05/21/2002 Report Date: 05/24/2002 PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. Gauge: Troxler 3430 Moisture Test Methods: ASTM D-2922 ASTM D-3017 Gauge Serial No: 32685 Current: 567 Test Mode: DT Previous: 576 MOISTURE DENSITY RELATIONS Maximum M/D No. Description Moisture % Density pcf 1 25.5 94.5 Dark Brown, Gray and Tan Clay Standard Counts Density Current: 2968 Previous: 2986 Project Requirements Moisture Density Optimum +5 95 mia FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pet') (PeO (% max) Footing 1 Retaining wall, Station I+00, grade 6" 1 26.9 Footing 2 Retaining wall, Station 4+00, grade 6" 1 26.8 Test results on this report meet project specification. Technician: Joe Jemigan Report Distribution: (1) City of Coppoll (1) City of Coppell (I) City of Coppell (I) lafrasmaoture Services, Inc. Started: 9:30am Finished: ll:30a (1) City of Coppell (1) Schrickcl, Rollins & Assoc., Inc. 114.6 90.3 117.0 92.3 ROneprcoj~~~ 96 98 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no contxoL Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Roue Engineers, Inc. 07DK Page 1 of 1 RoneEn g 8908 Ambassador Row Dallas, Texas 75247-.4510 (214) 630-9745 (214) 630--9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148627 Project No.: 015729 Date of Service: 04/26/2002 Report Date: 05/28/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: Co~rrRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 8274 PLACEMENT DATE: 04/26/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 9:40am BATCHTIME: 8:01am TEMPERATURE (F) - AIR 70 F CONCRETE: 80 F TRUCK NO: 462 TIC~T NO: 3119797 AIR CONTENT (%): 4.5 UNIT WEIGHT (pci): NA OVERALL PLACEMENT LOCATION: Red stamp entrance to Wagon Wheel Park at Creekview Drive SAMPLE LOCATION: 10' east x 5' north of southwest REPORT OF TESTS of red stamped entrance Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE 3.5 04/29/2002 3 124155 4390 Unbonded Cap 3.5 05/03/2002 7 143410 5070 Unbonded Cap 3.5 05/24/2002 28 164480 5820 Unbonded Cap 3.5 05/24/2002 28 162205 5740 Unbonded Cap Average 5780 1 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no contl'ol. Our lelters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 1 of 2 Report No.: 148627 RoneEn~i?.~.e~ Project No.: 015729 Client: City of Coppell CYLINDER MARKED SET NO. MEASURED SLUMP 0riches) DATE TESTED AGE (days) MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE Water added at site: 5 gallons Technician: Eric White Report DisWibution: (1) City of Coppell (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. Started: 8:30am (1) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. Finished: 10:30am Cla~ ~tark Project Manager LIMITATIONS: Thc test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 2 of 2