ST0001-LR020531ROneEn gineers
8908 Ambassador Row
Dallas, Texas 75247=4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
CHeat:
Project:
Services:
City of Coppell
At'm: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of flesh concrete at the placement locutions, perform required field testing, east compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DATE: 05/02/2002
WEATHER CONDITIONS: Clear
TIME SAMPLED: 3:00am BATCHTIME: 2:34am
TEMPERATURE (F) -AIR 70 F CONCRETE: 90 F
TRUCK NO: 1111 TICKET NO: 3144064
AIR CONTENT (%): 3.5 UNIT WEIGHT (PC0: NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creekview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 26+35
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 2.0 05/06/2002 4 83560 2950 Unbonded Cap
1 2 2.0 05/09/2002 7 92825 3280 Unbonded Cap
1 3 2.0 05/30/2002 28 117100 4140 Unbonded Cap
1 4 2.0 05/30/2002 28 118875 4200 Unbonded Cap
Average 4170
1 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or eonditinns over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Nc.
01DK Page 1 of 28
Repo~ No.: 149030 RoneEn~in~rs
Project No.: 015729
Client: City of Coppell
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 2 of 28
Ro gineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630=9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Attn: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infxastruc~re Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLA~Cr: 3
SPECWICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C- 172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
eLACEME~Cr DATE: 05/02/2002
WEATHER CONDITIONS: Clear
TIME SAMPLED: 3:50alTl BATCH TIME: 3:16am
TEMPERATURE (F) - AIR 70 F CONCRETE: 90 F
TRUCK NO: 1124 TICKET r~O: 3144073
AIR CONTENT (%): 4.0 UNIT WEIGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creckview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 24+55
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. Ouches) TESTED (days) (lbs. force) (psi) TYPE
2 I 2.5 05/06/2002 4 83050 2940 Unboaded Cap
2 2 2.5 05/09/2002 7 92480 3270 Unbonded Cap
2 3 2.5 05/30/2002 28 121110 4280 Unbonded Cap
2 4 2.5 05/30/2002 28 ! 16695 4130 Unbonded Cap
Average 4210
2 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f'all without the written approval of Rone Engineers, Inc.
01DK Page 3 of 28
Report No.: 149030 RoneEn~ine~ers
Project No.: 015729 Client: City of Coppell .............
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 4 of 28
RoneEn gineers
8908 Ambassador Row
Dallas, Texas 75247=4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Atto: Ms. Susan Taylor - Engineering Dcpt
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport P~rkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, east compressive strength samples and bring
samples back to the laboratory for curing and testing in accordgnce with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C- 172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DATE: 05/02/2002
WEATHER CONDITIONS: Clear
TIME SAMPLED: 3:40am BATCH TIME: 4:00am
TEMPERATURE (F) - AIR 70 F CONCRETE: 90 F
TRUCK NO: 1046 TlC~a~t NO: 3144082
AIR CONTENT (%): 4.25 UNIT WE~a~T (Pc0: NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creekview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 22+50
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 I 2.25 05/06/2002 4 74950 2650 Unbonded Cap
3 2 2.25 05/09/2002 7 88630 3130 Unbonded Cap
3 3 2.25 05/30/2002 28 114670 4060 Unbonded Cap
3 4 2.25 05/30/2002 28 114765 4060 Unbonded Cap
Average 4060
3 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature Of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 5 of 28
Report No.: 149030 RoneEngineera
Project No.: 015729 Client: City of Coppell m.~~
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 6 of 28
gineers
8908 Ambassador Row
Dallas, Texas 75247=4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Atto: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh tone,re at the placement locations, perform required field testing, east compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DATE: 05/02/2002
WEATHER CONDITIONS: C1car
TIME SAMPLED: 5:30alTl BATCH ~nZ: 4:52am
TEMPERATURE (IV} - AIR 72 F CONCRETE: 90 F
TRUCK NO: 966 TIC~T NO: 3144092
AIR CONTENT (%): 4.0 UNIT WEIGHT (pcf): NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creekview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 19+75
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE
4 1 2.75 05/06/2002 4 78550 2780 Unbonded Cap
4 2 2.75 05/09/2002 7 95640 3380 Unbonded Cap
4 3 2.75 05/30/2002 28 116365 4120 Unbonded Cap
4 4 2.75 05/30/2002 28 118445 4190 Unbonded Cap
Average 4160
4 5 Hold
LIMITATIONS: The test ~-sults presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use of the clients to whom they ere addressed and shall not be reproduced except in full without the written approval of Rone Engineers, ]nc.
01DK Page 7 of 28
Report No.: 149030 RoneEn~gine~e~
Project No.: 015729 Client: City of Coppell
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. 0nches) TESTED (days) Obs. force) (psi) TYPE
LIMITATIONS: The test results presented herein were pm'pared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject mat~er provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in flail without the written approval of Rone Engineers, Inc.
01DK Page 8 of 28
Ro gineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Arm: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, east compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP On):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C- 172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DAT~: 05/02/2002
WEATHER CONDITIONS: Clear
TIME SAMPLED: 7:20am BATCHTIME: 6:30am
TEMPERATURE (F) - AIR 72 F CONCRETE: 90 F
TRUCK NO: 964 TICKET NO: 3144102
AIR CONTENT (%): 4.75 UNIT WEIGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creekview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 18+75
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE
5 1 4.75 05/06/2002 4 79555 2810 Unbonded Cap
5 2 4.75 05/09/2002 7 95445 3380 Unbonded Cap
5 3 4.75 05/30/2002 28 120590 4260 Unbonded Cap
5 4 4.75 05/30/2002 28 121160 4280 Unbonded Cap
Average 4270
5 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
~ports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 9 of 28
Report No.: 149030 RoneEngineers
Project No.: 015729 Client: City of Coppell mmrmm~ll
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 10 of 28
RoneEngineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Arm: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creek'v/ew Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C- 1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DATE:
WEATHER CONDITIONS:
TIME SAMPLED: 8:15am
TEMPERATURE (r)- AIR
TRUCK NO: 1111
AIR CONTENT (%): 4.0
05/02/2002
Clear
BATCH TIME: 7:34am
68 r CONCRETE: 90
TlCKeT NO: 3144111
UNIT WEIGHT (per): NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creekview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 16+50
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
6 1 2.5 05/06/2002 4 82740 2930 Unbonded Cap
6 2 2.5 05/09/2002 7 92165 3260 Unbonded Cap
6 3 2.5 05/30/2002 28 116010 4100 Unbonded Cap
6 4 2.5 05/30/2002 28 118795 4200 Unbonded Cap
Average 4150
6 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 11 of 28
Report No.: 149030
Project No.: 015729
Client: City of Coppell
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE
Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we lmve no con~rol. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Pone Engineers, Inc~
01DK Page 12 of 28
Ro gineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Arm: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C- 172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DATE:
WEATHER CONDITIONS:
TIME SAMPLED: 9:00am
TEMPERATURE (F) - AIR
TRUCK NO: 8 21
AIR CONTENT (%): 4.0
05/02/2002
Cloudy
BATCH TIME: 8:08am
70 F CONCRETE: 90 F
TICKET NO: 3144120
UNIT WEIGHT (Pc0: NA
OVERALL PLACEMENT LOCATION:
Paving - no~h lane, Creekview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 14+75
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE
7 1 2.5 05/06/2002 4 83765 2960 Unbonded Cap
7 2 2.5 05/09/2002 7 103770 3670 Unbonded Cap
7 3 2.5 05/30/2002 28 127005 4490 Unbonded Cap
7 4 2.5 05/30/2002 28 128935 4560 Unbonded Cap
Average 4530
7 4 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject maRer provided by persons or conditions over which we have no control Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 13 of 28
Report No.: 149030 RoneEngineers
Project No.: 015729 Client: CityofCoppell mmmt~q~llm
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 14 of 28
RoneEngineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630=9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Arm: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratoxy for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C- 1064
ASTM C-138
ASTM C-39
MIXDESIGN I.D.: 38
PLACEMrNT DAT~.: 05/02/2002
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 10:00alI1 BATCHTIME: 9:13am
TEMPERATURE (F) - AIR 67 F CONCRETE: 90 V
TRUCK NO: 756 TICm~T NO: 3144133
AIR CONTENT (%): 4.25 UNIT WEIGHT (PC0: NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creekview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 12+60
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
8 1 2.0 05/06/2002 4 76895 2720 Unbonded Cap
8 2 2.0 05/09/2002 7 93965 3320 Unbonded Cap
8 3 2.0 05/30/2002 28 113765 4020 Unbonded Cap
8 4 2.0 05/30/2002 28 113750 4020 Unbonded Cap
Average 4020
8 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
~ports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 15 of 28
Report No.: 149030 RoneEngineers
Project No.: 015729 Client: City of Coppell ~l
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 16 of 28
Ro gineers
8908 Ambassador Row
Dallas, Texas 75247.-4510
(214) 63O-9745
(214) 6309819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Arm: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP On):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C- 172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C- 1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DATE: 05/02/2002
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: ll:00am BATCHTIME: 10:17am
TEMPERATURE (F} - AIR 69 F CONCRETE: 90 F
TaUCK NO: 820 TICr. J~T SO: 3144143
AIR CONTENT (%): 4.75 UNIT WEIGHT (pcf): NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creekview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 10+50
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (ps0 TYPE
9 1 4.5 05/06/2002 4 76340 2700 Unbonded Cap
9 2 4.5 05/09/2002 7 94355 3340 Unbonded Cap
9 3 4.5 05/30/2002 28 117375 4150 Unbonded Cap
9 4 4.5 05/30/2002 28 111765 3950 Unbonded Cap
Average 4050
9 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conUol. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 17 of 28
Report No.: 149030 RoneEngineers
Project No.: 015729 Client: City of Coppell
CYLINDER MEASURED MAXIMUM COMPRESSIVE
/VlARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 18 of 28
gJneers
8908 Ambassador Row
Dallas, Texas 75247.-4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Attn: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DAT~: 05/02/2002
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: ll:40am BATCHTIME: ll:18am
TEMPERATURE (F) - AIR 69 F CONCRETE: 90 F
TRUCKNO: 975 TICKET NO: 3144156
AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Crcekview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 8+35
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. 0nchea) TESTED (days) Obs. force) (psi) TYPE
10 1 2.25 05/06/2002 4 75420 2670 Unbonded Cap
10 2 2.25 05/09/2002 7 93660 3310 Unbonded Cap
10 3 2.25 05/30/2002 28 118445 4190 Unbonded Cap
10 4 2.25 05/30/2002 28 114310 4040 Unbonded Cap
Average 4120
10 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 19 of 28
Report No.: 149030 RoneEngineers
Project No.: 015729 Client: City of Coppell
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibiliW for vmiation in quality
(composition, appearance, performance, etc.) or any other feature of similar subjest matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 20 of 28
RoneEngineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Ama: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the labomtoDr for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3%-5%
ASTM C- 172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACeMeNT DATE: 05/02/2002
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 1:15pm BATCH TIME: 12:22pm
TEMPERATURE (F) - AIR 67 F CONCRETE: 90 F
TRUCK NO: 821 TICmeT NO: 3144169
AIR CONTENT (%): 4.0 UNIT WEIGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creckview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 6+35
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. 0Aches) TESTED (days) (lbs. force) (psi) TYPE
11 1 2.25 05/06/2002 4 78845 2790 Unbonded Cap
11 2 2.25 05/09/2002 7 94490 3340 Unbonded Cap
11 3 2.25 05/30/2002 28 118305 4180 Unbonded Cap
11 4 2.25 05/30/2002 28 112210 3970 Unbonded Cap
Average 4080
11 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assur0e no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DE Page 21 of 28
Report No.: 149030 RoneEngineers
Project No.: 015729 Client: City of Coppell m~mmm~l
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Oar letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 22 of 28
gineers
8908 Ambassador Row
Darius, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Arm: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creek-view Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive stxength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DATe: 05/02/2002
WEATHER CONDITIONS: Clolldy
TI~n~SAMPLED: 2:00pm BATCHTIM~: 12:58pm
TEMPERATURE (F) - AIR 72 ~* CONCRETE: 90 F
TRUC~: NO: 830 TICKET NO: 3144175
AIR CONTENT (%): 4.5 UNIT WEIGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creekview going westbound, Station 26+50 to Station 0-00
SAMPLE LOCATION: Station 5+50
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TeSTED (days) (lbs. force) (psi) TYPE
12 1 2.5 05/06/2002 4 81525 2880 Unbonded Cap
12 2 2.5 05/09/2002 7 87135 3080 Unbonded Cap
12 3 2.5 05/30/2002 28 117280 4150 Unbonded Cap
12 4 2.5 05/30/2002 28 112710 3990 Unbonded Cap
Average 4070
12 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 23 of 28
Report No.: 149030 Ronel:n~ine~e~
Project No.: 015729 ............
Client: City of Coppell
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conlxol. Our letters and
reports are for the exclusive use of the clients to whom they are addressed end shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 24 of 28
Ro gineers
8908 Ambassador Row
Dallas, Texas 7524%4510
(:214) 6.30-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
CHent:
Project:
Services:
City of Coppell
Atto: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creekview Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, east eorapressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
COmrRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3% - 5%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DATE: 05/02/2002
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 3:50pm BATCH TIME: 3:04pta
TEMPERATURE (F) - AIR 70 F CONCRETE: 90 F
muck NO: 1040 TICKET NO: 7116146
AIR CONTENT (%): 4.0 vNrr WEIGHT (per): NA
OVERALL PLACEMENT LOCATION:
Paving - noCth lane, Creek'view going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 4+00
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
13 1 3.5 05/06/2002 4 77025 2720 Unbonded Cap
13 2 3.5 05/09/2002 7 83125 2940 Unbonded Cap
13 3 3.5 05/30/2002 28 109390 3870 Unbonded Cap
13 4 3.5 05/30/2002 28 110340 3900 Unbonded Cap
Average 3890
13 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports arc for the exclusive use of thc clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 25 of 28
Report No.: 149030 RoneEngineers
Project No.: 015729 ............ ~l
Client: City of Coppell
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) ~STED (days) (lbs. force) (psi) TYPE
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 26 of 28
RoneEngineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City of Coppell
Arm: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Report No.: 149030
Project No.: 015729
Date of Service: 05/02/2002
Report Date: 05/31/2002
Creek-view Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: Lattimore
PLANT: 3
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
3%-5%
ASTM C- 172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 38
PLACEMENT DAm: 05/02/2002
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 5'00pm BATCHTIME: 4:16pm
TEMPERATURE (F) - AIR 75 F CONCRETE: 90 F
XRUCK NO: 1123 TIC~T NO: 617437
AIR CONTENT (%): 4.1 UNIT WElGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Paving - north lane, Creekview going westbound, Station 26+50 to Station 0+00
SAMPLE LOCATION: Station 3+50
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
14 1 2.0 05/06/2002 4 77115 2730 Unbonded Cap
14 2 2.0 05/09/2002 7 89585 3170 Unbonded Cap
14 3 2.0 05/30/2002 28 109400 3870 UnbondedCap
14 4 2.0 05/30/2002 28 111095 3930 Unbonded Cap
Average 3900
14 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 27 of 28
Report No.: 149030 RoneEngineer$
Project No.: 015729
Client: City of Coppell
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
DATE
TESTED
AGE
(days)
MAXIMUM COMPRESSIVE
LOAD STRENGTH FRACTURE
(lbs. force) (psi) TYPE
Water added at site: 10 gallons
Technician: Anthony Maldonado
Report Distribution:
(1) City of Coppell
(1) City of Coppell
(I) City of Coppell
(1) Infrastructure Services, Inc.
Started: 2;00am Finished: 6:00pm
(l) City of Coppell
(l) Schrickcl, Rollins & Assoc., Inc.
/
Clay S~k
Project IV~fiager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(anmposition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page 28 of 28