Northpoint Dr-CS020611T H E C I T Y O F
COPPELL
FxAS-~ laq
June 11, 2002
James Gaspard
Transwestem Commercial Services
5001 Spring Valley Road, Suite 600W
Dallas, TX 75244
RE: Street Sign Fee Assessment / Northpoint Drive
Dear Sir:
Enclosed with this letter you will find the street sign assessment for Northpoint Drive. Prior to the
final acceptance of this project, a check in the amount of 754.43 should be made payable to the City
of Coppell and forwarded to the Engineering Department. Please include a copy of this street sign
fee assessment list. Engineering wi1I process the payment and forward it to the Finance Director to
assure a successful completion of this project
If you should have any questions please feel free to contact me at your convenience.
Sincerely
r,~ ~
Kenneth M. Griffin, P.E.
Director of Engineering & Public Works
Office Phone: (972) 304-3686
Fax: (972) 304-7041
cc: Jennifer Armstrong, Finance Director
Greg Jones, Building Official
Glenn Hollowell P.E., Asst. Dir. of Public Works
Rhonda Brothers, Engineering Secretary
223 PARKWAY * P. O.BOX 478 * COPPE LL TX 75019 * TEL 972/462 0022 * PAX 972/304 3673
06/11/02 15:54 CITY OF COPPELL a 972 304 '7041 1`10.066 1701
Ftail~i 17fd~
IID1E]~ALrR7i'1~R~ ®F P[Jl~]LII~ ~®IIBI~ffi
DATE: June 11, 2002
TO: Teresa Turner, Graduate Engineer
FROM: ferry Morton, Sign 3 Signal Tech.
RE: Sign Assessment Fees . ~grth inl Dr.
The following fee should be assessed and collected on the above referenced project.100% due prior
to final acceptance of project.
8treeQ Si a ee
The following assessment is being made in accordance with the City o/ Coppell Subdivision
Ordinance Appendix A Chapter VIII A. The following costs of those sign materials required are
based on cement pricing which is reviewed on a regular basis.
SIGN NIT P LE QUANTITY EXTENDED PRLCE
No Parking S4a.43 Q ~
Speed Limit 5 .91 ~ 1 5
Street Names 10 . Q ~Q.QQ
Yield - w/names E130.94 0 0.00
Stop - w/names 1 48 ,~ 5278
blaming Sign ;Pi65.87 '1 ~~Z
Keep Right median) 52•g ~ ~4.~
Object Markers(L8R) ; ~ ~~
SIGN Double Arcow 5131.14 ~ 1.1
SIGN Lene Use 152.91 1 ~~.
SIGN 4 ~~
sIGN 4
SIGN Q
SIGN Q '~
~~ 1 .0 2 x.00
5% Adminstretive Cosa 39~ 7S 18.50 535.93
TOTAL 5754.43
• Cost breakdowns may be obtained by written request
Sign FN