Deforest Court-LR020601REPORT OF DRILLED BELLED PIER OBSERVATION
Report Number: 94021181.0004
Service Date: May 20, 2002
Client: The Holmes Builders Report Date:
Attn: Terry Holmes Project:
1406 Halsey Way Suite 100
Carrollton TX 75007
Services: Drilled belled pier observation.
Technician: Phil Green
Report Distribution:
(1) The Holmes Builders
(1) City of Coppell Constr Insp
(1) City of Coppell Bldg lnsp
Project Numbe 1 1 181
Reviewed by:
#5
IINCINEERING
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630 -1010
e01,20
D orest Court L
ingl Family Home
oppell, Texas
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
drilled belled pier observation. See the attached sheet(s) for recorded data.
Hussein H. Abusaad, P.E.
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials. Page 1 of 1
mSSiR .FUa Way
I z
II Zl
9£
I FIE
II 6
II 0'6
II 96
11 £8
II tia
11 seA
II V/N
II V/N
11 Z 1
II 9 I
II 8
11 wd03 :8
81.
Zl
9£
L' L6
ZO1.
O'1I.
L'6
tia
SOA
V/N
V/N
9
•w'd 00:£
Ll
ZL
9E
l'L6
6
9'6
0'01
1'8
tia
se),
V/N
V/N
Z
9
8
•w d 9£:Z
1 3: :10 p.m.
91.
1 3L
9£
VL6
96
8'6
6'L
1 tid
SOA
V/N
V/N I
Z I
2:50 p.m.
1 bl
31.
T 9£
I L' L6
86
6•6
9'8
tia
SOA
V/N
V/N I
9 I
8 I
'd 9l E
L
1 Z L
9£
I L' L6
1 6
1 6-
b 6
1'8
M
SOA
V/N
V/N
9 I
1 10:00 a.m.
w•d 9£:£
Zl
9E
L.' L6
6
0'6
9•6
Z'8
tia
SOA
V/N
V/N
Z
9
8 1
9:40 a.m.
.w 08:8
9
31.
9£
L' L6
6
6'8
0'6
L'
M
SOA
V/N
V/N
Z
9
8
.8 -re 93:6
'w'd 9Z I
1
91.
1 Z1
9E
1'L6
6
0'01.
0' I.
L'6
Na
SeA
V/N
V/N
Z I
9
9
'w'e 01:6
_w.d gI :E
9
Zl
9E
l'L6
6
£'6
V'6
9'L
tia
SOA
V/N
V/N
Z_ I
8 I
1 8:50 a.m.
•w'd OI:E I
1 31.
9E
I L* L6
I
l'6
Z'6
6'
tia
SOA
V/N
V/N I
1
9£:8 I
1
'w'd OZ :C t
11 Pier Identification
II Pier Diameter (in.)
II Bell Diameter (in.)
II *Top of Pier Elevation (ft)
II Req. Depth from Exist. Grade (ft)
II Initial Depth of Pier from Existing
Grade (ft)
N Final Depth of Pier from Existing
II Grade (ft)
II Depth from Top of Concrete (ft)
I (tip Jo tam) wouog ;o uol3lpuo0 II
II Plumb Within Tolerance (yes or no)
II Casing Diameter (in)
u) tudea pose° II
II Number of Vertical Bars (ea.)
OZIS peg 6143.1(40R :I II
('u) BJeg leo!PGA to 436ua�
II Time Drilling was Completed
Time Concrete was Placed
cc
a.
LLI
u.
cc
0
cc
0.
cc
o.
cu
Cop Cr■
a.
*Elevation was provided by others.
615 DeForest Court Lot #5
Date of Service:
1.1.
ZL
9£
11
o.6
II £'6
II 08
11 ma
II seA
II V/N
II V/N
11 z 1
II g 1
II 8
it wdg4.Z
0
ZL
9£
L'L6
I 0'6
6•6
6'6
9'8
/up
seA
V/N
V/N
w d OO :Z
LZ
I Z4
9E
L'L6
0'6
L6
6'6
98
N°
SOA
V/N
V/N
•w•d 09:L
£Z
ZL
9E
(L 6
0'6
Z6
0'0 I.
L'8
Np
seA
V/N
V/N
g
r
r
w'd g1:4
1 2:40 p.m.
Z Z
ZL
9£
L'L6
0'6
86
001.
L'8
fu
seA
V/N
V/N
r
Z£
Z4
9£
L'L6
0'6
88
9'6
Z'8
SOA I
V/N
V/N
zI
1 12:45 p.m.
17 Z
Z
1 9£
L'L6
I 0•6
I 96
£'04
0'6
At a
seA
V/N I
V/N
zI
g
8 I
gZ:
E£
Z4
9E
L'L6
0'6
0'lL
0'Z
L'O
Np
SOA
V/N
V/N
Z
g
8
w'e 00 ;L4
LE
I.
9E
L' L6
1
I 9.04
r 0'L4
L'6
'Gp
SOA
V/N
V/N
9
1:00 p.m.
•w d 9Z:Z 1
I 9£
I Z4
I 9E
L'L6
0'6
I 0'6
96
Z'8
tip
SOA
V/N
V/N
Z I
12:15 p.m.
•w•d OZ :Z
ire
I Z4
I 9£
L'L6
1 0'6
I 6'6
I 6'0 4
9'6
Np
SOA
V/N
V/N I
I
'w'e 0E :1.4
ti
wd gL:Z
II Pier Identification
(111) aalawela Jeld I I
ul) aalawela Ila9
(31) uollenal3 mid to a0.1.. I
I (33) ape•a •lslx3 wag 43aaa 'Daa
Initial Depth of Pier from Existing
Grade (ft)
I
Il Final Depth of Pier from Existing
Grade (ft)
(u) alaaauoa to dol woal giaea II
(Mp JO ISM) WOUO9 Jo uolllpuo3
(ou .10 say =tempi uI4AM gwnid
(ul) aatewela duisea
1
(10 43daa pesea
("ea) saes le0!)a0A ;o aagwnN
i
MIS aes DUIOJO ;ulay
('33) saes !anRaaA )o 43Due,
I
o
palalawoa seM DuIIINa awll II
0
I
II Time Concrete was Placed
CC
CU
Ori
0
0.
REPORT OF DRILLED BELLED PIERS
*Elevation was provided by others.
615 DeForest Court Lot #5
Date of Service:
co
cc
co
CC
CC
V
LLI
CC
0
z
0
0
o.
cc
d
O
N
Cn
r
0
G M
m
a
cci
o
co
cct
0
Ci I f;
a`
REPORT OF DRILLED BELLED PIER OBSERVATION
Report Number: 94021181.0006
Service Date: May 21, 2002
Client: The Holmes Builders
Attn: Terry Holmes
1406 Halsey Way Suite 100
Carrollton TX 75007
Services: Drilled belled pier observation.
Project:
OW
e orest Court Lot
Single Family Home
Coppell, Texa
Report Date: June
Projec 4021181
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
drilled belled pier observation. See the attached sheet(s) for recorded data.
rfit
oce
P tl
on of lrena,
ENGINEERING
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630 -1010
Technician: Robert Sneed
Report Distribution: HBC Engineering
(1) The Holmes Builders Reviewed by:
(1) City of Coppell Constr Insp H in H. Abusaad, P.E.
(1) City of Coppell Bldg Insp
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1 ffiSSM93FWKey
cc
LLI
CC
CC
O.
W
CC
o.
cc
cn
0.
CI
In 04
o
o
`Elevation was provided by others.
Date of Service:
11 8
9'6
III
II tia
II seA
II V/N
II V/N
11 z
11 5 1
I1
1 10:05 a.m.Il
I LZ
1 ZL
9E
V/ N
1 V/N
8 '8
68
6'0
tia
seA I
V/N
V/N
1
0'8
we97 :01
6£
I ZL
9E
V/N
V/N
L 8
06
L' l
/Ja
saA
V /N
V/N
0'8
•w'e9llL
97
ZL
9E
V/N
V/■
re
I E'6
0'L
tia
saA
V/N
V/N
0'8
'w'd OZ :Zi.
9E
1 Z
9£
1 VIN
V/N
I 96
96
0'L
SeA
V /N
V/N
0'8
1 12:40 p.m.
2:38 p.m.
8E
Zl
9£
V/N
V/N
I Z6
I 0'01.
1 OL 1
/Ja
se
•/N
7/1
Z
1
0'8
wd57 :L
0£
I.
1 9E
V/N
V/N
78
06
0•L
tia
SOA
V/N
V/N
Z I
9
0'8
•w•e 51 :0L
ZL
9E
V/N
V/N
6'8
0'6 I
0 '1
tia
SOA
VIN
V/N
Z l
9
0'8
'w'B 0£ :O1
1 Zl
1 s£
I V/N
V/N
l 8'8
0'6
0'L
fu
SOA
V/N
V/N I
0'8
.•.0 01:6 I
1 Zl
9£
I V/N
I V/N
1 88
I Z6
0
Na
SOA
V/N I
V/N I
0'8 I
w.e OZ :6 I
w• 57
I 6L
1 Zl
I 9E
I V/N
I V/N
68
68
L'0
Ala
seA
V/N I
VIN I
1
I
0'8 I
'w'e OP :6 I
07 :1
u
L
vui/ JeyewcgJ ao;O II
i
L
•Tnn of New Flavatinn lftl
111/ "Pen, iaiwy wwf 44.* **'U
i
1
Initial Depth of Pier from Existing
rerin 1ftl
i
4• CIsal A
Final Depth of Pier from Existing
rftiln /ft\
Cnnditinn of Rnttnm /wet or drvl
i
i
i
i
i
too Jo SBA/ eoucarlIVJ. UlH1lM 4`"x'10 II
i
1
i
i
i
Gainfnrrinn Rer Size #1
cc
LLI
CC
CC
O.
W
CC
o.
cc
cn
0.
CI
In 04
o
o
`Elevation was provided by others.
Date of Service:
0.
CC
o
N 'b
N
oo
co
C
REPORT OF DRILLED BELLED PIERS
615 DeForest Court Lot #5
*Elevation was provided by others.
Date of Service:
£4
1 Zl
9£
V/N
V/N
88
£'6
6'0
/Ja
SOA
V/N
V/N
0'8
'w'd OL:ZL
'w'd 0£:Z I
Z4
ZL
1 9£
V/N
V/N
0'6
IL 6
0'I.
Na I
SO)
V/N
V/N
9 l
0'8
94:L
.w.d o o:Z
04
Z
9£
I V/N
V/N
I £'6
£'6
0'
tia
SO),
V/N
V/N
Z 1
9
0'8 1
'ua'a 09: L L I
•wd90:Z
8Z
ZL
98
V/N
V/N
6'8
0'6
0'I.
tia
SOA
V/N
V/N
Z
9
08
10:50 a.m.
'w'd OZ:Z I
L4
Z L
9£
V/N
V/N
L'6
4'6
Z' L
tia
se),
V/N
V/N
9
0'8
11:40 a.m.
'w'd 93:Z 1
44
ZL
9£
l V/N
V/N
I Z6
Z'6
L• L
tia
se),
V/N
V/N
08
10.20 a.m.
'w'd g I
L£
I ZL
1 9£
V/N
I V/N
L8
Z'6
0'I.
tia
se),
V/N l
V/N
1
0'8 I
12:30 p.m.
•w•d OL:Z
II Pier Identification I
11 Pier Diameter (in.)
11 Bell Diameter (in.)
(ii) uogenal3 Bald io dol. 1l
(14) apel0 •islx3 w0 4iaaa 'dais
Initial Depth of Pier from Existing
Grade (ft)
Final Depth of Pier from Existing
Grade (ft)
(u) etaaouo) ;o dol of 43dea 11
11 Condition of Bottom (wet or dry)
(ou JO seA) eoueieiol ulygM gwnld 11
11 Casing Diameter (in)
1
11 Cased Depth (ft)
(•ea) saes leollJeA io JegwnN 1l
azlg Jag Buloaojulaii 1
('u) sae IsoliaeA io yinuei
1
pegaldwoO sem Bullllaa awls
III
Al i
IL Time Concrete was Placed
0.
CC
o
N 'b
N
oo
co
C
REPORT OF DRILLED BELLED PIERS
615 DeForest Court Lot #5
*Elevation was provided by others.
Date of Service: