Loading...
Deforest Court-LR020601REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021181.0004 Service Date: May 20, 2002 Client: The Holmes Builders Report Date: Attn: Terry Holmes Project: 1406 Halsey Way Suite 100 Carrollton TX 75007 Services: Drilled belled pier observation. Technician: Phil Green Report Distribution: (1) The Holmes Builders (1) City of Coppell Constr Insp (1) City of Coppell Bldg lnsp Project Numbe 1 1 181 Reviewed by: #5 IINCINEERING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630 -1010 e01,20 D orest Court L ingl Family Home oppell, Texas On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. Hussein H. Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 mSSiR .FUa Way I z II Zl 9£ I FIE II 6 II 0'6 II 96 11 £8 II tia 11 seA II V/N II V/N 11 Z 1 II 9 I II 8 11 wd03 :8 81. Zl 9£ L' L6 ZO1. O'1I. L'6 tia SOA V/N V/N 9 •w'd 00:£ Ll ZL 9E l'L6 6 9'6 0'01 1'8 tia se), V/N V/N Z 9 8 •w d 9£:Z 1 3: :10 p.m. 91. 1 3L 9£ VL6 96 8'6 6'L 1 tid SOA V/N V/N I Z I 2:50 p.m. 1 bl 31. T 9£ I L' L6 86 6•6 9'8 tia SOA V/N V/N I 9 I 8 I 'd 9l E L 1 Z L 9£ I L' L6 1 6 1 6- b 6 1'8 M SOA V/N V/N 9 I 1 10:00 a.m. w•d 9£:£ Zl 9E L.' L6 6 0'6 9•6 Z'8 tia SOA V/N V/N Z 9 8 1 9:40 a.m. .w 08:8 9 31. 9£ L' L6 6 6'8 0'6 L' M SOA V/N V/N Z 9 8 .8 -re 93:6 'w'd 9Z I 1 91. 1 Z1 9E 1'L6 6 0'01. 0' I. L'6 Na SeA V/N V/N Z I 9 9 'w'e 01:6 _w.d gI :E 9 Zl 9E l'L6 6 £'6 V'6 9'L tia SOA V/N V/N Z_ I 8 I 1 8:50 a.m. •w'd OI:E I 1 31. 9E I L* L6 I l'6 Z'6 6' tia SOA V/N V/N I 1 9£:8 I 1 'w'd OZ :C t 11 Pier Identification II Pier Diameter (in.) II Bell Diameter (in.) II *Top of Pier Elevation (ft) II Req. Depth from Exist. Grade (ft) II Initial Depth of Pier from Existing Grade (ft) N Final Depth of Pier from Existing II Grade (ft) II Depth from Top of Concrete (ft) I (tip Jo tam) wouog ;o uol3lpuo0 II II Plumb Within Tolerance (yes or no) II Casing Diameter (in) u) tudea pose° II II Number of Vertical Bars (ea.) OZIS peg 6143.1(40R :I II ('u) BJeg leo!PGA to 436ua� II Time Drilling was Completed Time Concrete was Placed cc a. LLI u. cc 0 cc 0. cc o. cu Cop Cr■ a. *Elevation was provided by others. 615 DeForest Court Lot #5 Date of Service: 1.1. ZL 9£ 11 o.6 II £'6 II 08 11 ma II seA II V/N II V/N 11 z 1 II g 1 II 8 it wdg4.Z 0 ZL 9£ L'L6 I 0'6 6•6 6'6 9'8 /up seA V/N V/N w d OO :Z LZ I Z4 9E L'L6 0'6 L6 6'6 98 N° SOA V/N V/N •w•d 09:L £Z ZL 9E (L 6 0'6 Z6 0'0 I. L'8 Np seA V/N V/N g r r w'd g1:4 1 2:40 p.m. Z Z ZL 9£ L'L6 0'6 86 001. L'8 fu seA V/N V/N r Z£ Z4 9£ L'L6 0'6 88 9'6 Z'8 SOA I V/N V/N zI 1 12:45 p.m. 17 Z Z 1 9£ L'L6 I 0•6 I 96 £'04 0'6 At a seA V/N I V/N zI g 8 I gZ: E£ Z4 9E L'L6 0'6 0'lL 0'Z L'O Np SOA V/N V/N Z g 8 w'e 00 ;L4 LE I. 9E L' L6 1 I 9.04 r 0'L4 L'6 'Gp SOA V/N V/N 9 1:00 p.m. •w d 9Z:Z 1 I 9£ I Z4 I 9E L'L6 0'6 I 0'6 96 Z'8 tip SOA V/N V/N Z I 12:15 p.m. •w•d OZ :Z ire I Z4 I 9£ L'L6 1 0'6 I 6'6 I 6'0 4 9'6 Np SOA V/N V/N I I 'w'e 0E :1.4 ti wd gL:Z II Pier Identification (111) aalawela Jeld I I ul) aalawela Ila9 (31) uollenal3 mid to a0.1.. I I (33) ape•a •lslx3 wag 43aaa 'Daa Initial Depth of Pier from Existing Grade (ft) I Il Final Depth of Pier from Existing Grade (ft) (u) alaaauoa to dol woal giaea II (Mp JO ISM) WOUO9 Jo uolllpuo3 (ou .10 say =tempi uI4AM gwnid (ul) aatewela duisea 1 (10 43daa pesea ("ea) saes le0!)a0A ;o aagwnN i MIS aes DUIOJO ;ulay ('33) saes !anRaaA )o 43Due, I o palalawoa seM DuIIINa awll II 0 I II Time Concrete was Placed CC CU Ori 0 0. REPORT OF DRILLED BELLED PIERS *Elevation was provided by others. 615 DeForest Court Lot #5 Date of Service: co cc co CC CC V LLI CC 0 z 0 0 o. cc d O N Cn r 0 G M m a cci o co cct 0 Ci I f; a` REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021181.0006 Service Date: May 21, 2002 Client: The Holmes Builders Attn: Terry Holmes 1406 Halsey Way Suite 100 Carrollton TX 75007 Services: Drilled belled pier observation. Project: OW e orest Court Lot Single Family Home Coppell, Texa Report Date: June Projec 4021181 On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. rfit oce P tl on of lrena, ENGINEERING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630 -1010 Technician: Robert Sneed Report Distribution: HBC Engineering (1) The Holmes Builders Reviewed by: (1) City of Coppell Constr Insp H in H. Abusaad, P.E. (1) City of Coppell Bldg Insp Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ffiSSM93FWKey cc LLI CC CC O. W CC o. cc cn 0. CI In 04 o o `Elevation was provided by others. Date of Service: 11 8 9'6 III II tia II seA II V/N II V/N 11 z 11 5 1 I1 1 10:05 a.m.Il I LZ 1 ZL 9E V/ N 1 V/N 8 '8 68 6'0 tia seA I V/N V/N 1 0'8 we97 :01 6£ I ZL 9E V/N V/N L 8 06 L' l /Ja saA V /N V/N 0'8 •w'e9llL 97 ZL 9E V/N V/■ re I E'6 0'L tia saA V/N V/N 0'8 'w'd OZ :Zi. 9E 1 Z 9£ 1 VIN V/N I 96 96 0'L SeA V /N V/N 0'8 1 12:40 p.m. 2:38 p.m. 8E Zl 9£ V/N V/N I Z6 I 0'01. 1 OL 1 /Ja se •/N 7/1 Z 1 0'8 wd57 :L 0£ I. 1 9E V/N V/N 78 06 0•L tia SOA V/N V/N Z I 9 0'8 •w•e 51 :0L ZL 9E V/N V/N 6'8 0'6 I 0 '1 tia SOA VIN V/N Z l 9 0'8 'w'B 0£ :O1 1 Zl 1 s£ I V/N V/N l 8'8 0'6 0'L fu SOA V/N V/N I 0'8 .•.0 01:6 I 1 Zl 9£ I V/N I V/N 1 88 I Z6 0 Na SOA V/N I V/N I 0'8 I w.e OZ :6 I w• 57 I 6L 1 Zl I 9E I V/N I V/N 68 68 L'0 Ala seA V/N I VIN I 1 I 0'8 I 'w'e OP :6 I 07 :1 u L vui/ JeyewcgJ ao;O II i L •Tnn of New Flavatinn lftl 111/ "Pen, iaiwy wwf 44.* **'U i 1 Initial Depth of Pier from Existing rerin 1ftl i 4• CIsal A Final Depth of Pier from Existing rftiln /ft\ Cnnditinn of Rnttnm /wet or drvl i i i i i too Jo SBA/ eoucarlIVJ. UlH1lM 4`"x'10 II i 1 i i i Gainfnrrinn Rer Size #1 cc LLI CC CC O. W CC o. cc cn 0. CI In 04 o o `Elevation was provided by others. Date of Service: 0. CC o N 'b N oo co C REPORT OF DRILLED BELLED PIERS 615 DeForest Court Lot #5 *Elevation was provided by others. Date of Service: £4 1 Zl 9£ V/N V/N 88 £'6 6'0 /Ja SOA V/N V/N 0'8 'w'd OL:ZL 'w'd 0£:Z I Z4 ZL 1 9£ V/N V/N 0'6 IL 6 0'I. Na I SO) V/N V/N 9 l 0'8 94:L .w.d o o:Z 04 Z 9£ I V/N V/N I £'6 £'6 0' tia SO), V/N V/N Z 1 9 0'8 1 'ua'a 09: L L I •wd90:Z 8Z ZL 98 V/N V/N 6'8 0'6 0'I. tia SOA V/N V/N Z 9 08 10:50 a.m. 'w'd OZ:Z I L4 Z L 9£ V/N V/N L'6 4'6 Z' L tia se), V/N V/N 9 0'8 11:40 a.m. 'w'd 93:Z 1 44 ZL 9£ l V/N V/N I Z6 Z'6 L• L tia se), V/N V/N 08 10.20 a.m. 'w'd g I L£ I ZL 1 9£ V/N I V/N L8 Z'6 0'I. tia se), V/N l V/N 1 0'8 I 12:30 p.m. •w•d OL:Z II Pier Identification I 11 Pier Diameter (in.) 11 Bell Diameter (in.) (ii) uogenal3 Bald io dol. 1l (14) apel0 •islx3 w0 4iaaa 'dais Initial Depth of Pier from Existing Grade (ft) Final Depth of Pier from Existing Grade (ft) (u) etaaouo) ;o dol of 43dea 11 11 Condition of Bottom (wet or dry) (ou JO seA) eoueieiol ulygM gwnld 11 11 Casing Diameter (in) 1 11 Cased Depth (ft) (•ea) saes leollJeA io JegwnN 1l azlg Jag Buloaojulaii 1 ('u) sae IsoliaeA io yinuei 1 pegaldwoO sem Bullllaa awls III Al i IL Time Concrete was Placed 0. CC o N 'b N oo co C REPORT OF DRILLED BELLED PIERS 615 DeForest Court Lot #5 *Elevation was provided by others. Date of Service: