Dry Clean & Donut-CS020611June 11, 2002 Dave Randhawa DR Construction 3605 Whiffletree Dr Plano, TX 75023 RE: Dry Clean City/Donut City Final Acceptance Pending Dear Dave: Representatives of the City of Coppell performed a final wallc thru inspection of paving and utilities for the referenced project May 16, 2002. It appears that all construction items have been addressed and corrected. However, the two -year maintenance bonds have not been received nor have lab- testing reports on the paving subgrade been provided to this office. These two remaining items must be forwarded to the Engineering Department as soon as possible in order for the project to be accepted by the City of Coppell. Please make this a priority so that the project can be completed in a timely manner for all concerned. Sincerely Larry. v Cons i tion 1 or Office Phone: (972) 304 -3684 Fax: (972) 304 -3570 TM E C 1 T Y O F COPPELL A 8 Tom Nguyen 2825 Kings Gate Dr. Carrollton, TX 75006 cc: Ken Griffin, Director of Engineering Public Works Rhonda Brothers, Engineering Secretary 255 PARKWAY P.O.BOX 478 COPPELL TX 75019 TEL 972/482 0022 FAX 972/304 3873