Reserve-CS011224T H E C 1 T Y O F
COPPELL
~ ~ ~ e~
r ~~ o
e x A b X 8 4
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Garreth Campbell, Construction Inspector
Larry Davis, Construction Inspector
From: Rhonda Brothers, Engineering Secretary
Date: December 24, 2001
RE: Expu u-g Maintenance Bond(s)
The indicated Maintenance Bond(s) will expire as follows:
Project: Date: Inspector:
The Reserves 2/24/02 Larry Davis
Please re-inspect the above mentioned project(s) to see that the public improvements
for this project are in satisfactory condition.
"CITY OF COPPELL ENGINEERING -EXCELLENCE BY DESIGN"