Loading...
WIndsor Estates-PT000825ff The My VWh A BeautM Hffiun CONSTRUCTION DEVELOPMENT PERMIT APPLICATION 1. Name of Applicant: (�o�- DPi 1 r) o r-i A e: Address: Z(o 7 _;> 2 I. A L W U i HI LL Lac lutes. it Zor) DA t,�S TIC Phone Number: (G 1 4) 3 - 9 O 5 - 7 SZ aj 2 3 4. Location of Construction (address): U Z_ D E Fp 2CS ► RD e _IJIt\loso2 es -,^-Z s Subdivision Section k Block g Lot g Or: f \ ILA - (6ZtM >LG 5JSVE: -A,55 No, a(olbb,H,140UNTS A65 Ne.$74 15,1 b A RZS Survey /Abstract a Acreage Location description (attach vicinity map): Type of construction or development: (LAesidential () Alteration of a natural waterway drainage course ( ) Non - residential ( ) Other (describe & attach drawing or sketch) ( ) Placement of Fill (in right -of -way or on private property) Description of Construction Permit requested: ( ) Paving ( ) Median or Landscaping ( ) Box Culvert ( ) Sidewalk ( ) Water Main ( ) Drive Approach ( ) R.C.P. ( ) Excavation ( ) Sanitary Sewer Main ( ) Fire Lane () Flume ( ) Bridge () Inlet ( ) Rip Rap ( ) Fill Area ( ) Drainage Channel Excavation ( ) Slope Protection Retaining Wall ( ) Parking Lot Please provide the name, address and 24 hour phone number for supervisor of every contractor working under this general permit. Rt v4d 3;99 CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5. All construction shall follow the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and stamped approved plans. The activity shall be in compliance with Erosion and Sedimentation Ordinance. 6. Applicant shall provide one copy of approved plans, specifications and related cost estimate or contract of the proposed construction for the purpose of permit fee calculations. 7. A Construction Permit Fee in accordance with the City of Coppell Fee Ordinance shall be paid prior to beginning work. Amount Paid Z 9- Date Paid l U d NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right -of -way notVproved by the City Engineer. v Date FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? kYes OffQo If yes, then a Floodplain Development Permit is required before any construction can begin. ✓ Is additional information required? Are other federal, state or local permits required? kYARMIT APPLICATION APPROVED ( ) PERMIT APPLICATION DISAPPROVED ' City Appr val ( ) Yes VfNo ( ) Yes VrNo c S� I I Keck g10 1 94Z 9.).3-00 Date Forms /permi Wconstdev Construction Estimate for Windsor Estates - Coppell, Texas - 16 Acres 24- Jul -00 Grading Clear and Grub Excavation Lot Benching Demolition of Asphalt, Fencing, and Houses Silt Fence Construction Entrance * Current low Bidder is Gregory Excavating in Dallas, Tx. Concrete Soil Stabilization 6" Concrete Pavement Rolled Curb 6" Flex Base Concrete Sidewalks Median Pavers *Current low Bidder is in Dallas, Tx. utiiities Water Waste water Storm Sewer *Current low Bidder is TGR Constructors, Inc. in Bedford, Tx. Landscapin Irrigation Sod Trees and Shrubs *Current Low Bidder is Garden Design in Dallas, Tx. Stone Entry Stone wall Stone tower Brick pillars *Current low Bidder is Vole' Stone in Dallas, Tx. 16 acres 100000 cy 25 ea Is 2600 If 1 ea 8400 sy 3879 sy 3800 If 2000 sy 100 sy 300 sy Is Is Is Is 21000 sf Is 180 If 1 ea 2 ea Gregory Excavating has paid Inspection Fees for this portion $163,965.00 $160,983.00 $45,080.00 $21,430.00 Subtotal $391,458.00 Less Landsca in tone Ent - $ 66,510.00 Total Construction Cost $324,948,00 Inspection Fees at 4% $1X;997:92 _ t�4 c JOB NO.: • K I l l ♦ ,y INT[ CITY oNna ACCOUNT CdOE: DATE: Ap l 8, 2000 SUBCONTRACT (SHORT FORM) This agreement is made this 18 day of April 2 000 , and effective the 18 day of April 2 000 , by and between Coppell Optimum Assets, L.C. (Contractor) and Gregory Excavating Company, Inc . (Subcontractor) to perform the Work identified in Article 2 in accordance with the Project's Contract Documents. PROJECT: Windsor Estates OWNER: Coppell Optimum Assets, L.C. ARCHITECT: Halff & Associates CONTRACTOR: Coppell Optimum Assets, L.C. SUBCONTRACTOR: Gregory Excavating Company, Inc. CONTRACT PAYMENT. The Contractor agrees to pay Subcontractor for satisfactory performance of Subcontractor's Work the sum of fifty thousand dollars Dollars ($ 50,000.00 ) Progress payments, less retainage of 10 %, shall be made to Subcontractor for Work satisfactorily performed no later than seven (7) days after by Contractor of payment from Owner for Subcontractor's Work. Final payment of the balance due shall be made to Subcontractor no later than seven (7) days after receipt by Contractor of final payment from Owner for Subcontractor's Work. These payments are subject to receipt of such lien waivers, affidavits, warranties, and guarantees required by the Contract Documents or Contractor. ARTICLE 2 SCOPE OF WORK. Subcontractor agrees to commence Subcontractors Work herein described upon notification by Contractor, and to perform and complete such Work in Accordance with Contract Documents and under the general direction of Contractor in accord with Contractors schedule. This shall include all work necessary or incidental to complete the: / ' Si to o ng, demnl i ti nn n{= hn isas grndpc to a �r�nZ AT° telLth, t r81LOV�l Work for the Project as more particularly, though not exclusively specified in ARTICLE 3 SCHEDULE OF WORK. Time is of the essence. Subcontractor shall provide Contractor with any requested scheduling information of Subcontractors Work. The Schedule of Work, including that of this Subcontract shall be prepared by Contractor may be revised as the Work progresses. Subcontractor recognizes that changes may be made in the Schedule of Work and agrees to comply with such changes without additignal compensation. Subcontractor shall coordinate its work with all other contractors, subcontractors, and suppliers on the Project so as not to delay or damage their performance, work, or the Project. Project: Windsor Estates- Coppell T .s TGR Constructors, Inc. Subtotal Project $ 151,732.50 Material Taxes $ 5,541.00 Bonds $ 3,710.00 Total Project $ 160,983.50 Item Quantity Unit Price Total Price Water 1 8" C -900 DR -14 1935 If $ 12.50 $ 24,187.50 2 6" C -900 DR -14 40 If $ 11.50 $ 460.00 3 1" Services 26 ea $ 450.00 $ 11,700.00 4 8" Gate Valves 6 ea $ 600.00 $ 3,600.00 6 6" Gate Valves 3 ea $ 450.00 $ 1,350.00 8 12" x 8" Tapping Sleeve & Valve 1 ea $ 1,600.00 $ 1,600.00 7 Fire Hydrants 3 ea $ 1,025.00 $ 3,075.00 8 Fittings 1 Is $ 2,000.00 $ 2,000.00 9 Meter Boxes 26 ea $ 75.00 $ 1,950.00 10 Testing 1 Is $ 250.00 $ 250.00 11 Trench Safety 1 Is $ 250.00 $ 250.00 Subtotal Water $ 50,422.50 Item Quantity Unit Price Wastewater 1 10" SDR -35 2335 If $ 14.75 $ 34,441.25 2 4" Services 26 ea $ 400.00 $ 10,400.00 3 4' Diameter Manholes 12 ea $ 1,100.00 $ 13,200.00 4 Connect To Existing Manhole 1 ea $ 500.00 $ 500.00 a Concrete Pavement Repair 175 If $ 25.00 $ 4,375.00 6 1 112" Asphalt Pavement Repair 530 If $ 10.00 $ 5,300.00 7 Resodding 175 If $ 2.50 $ 437.50 8 Testing 2335 If $ 1.00 $ 2,335.00 9 Trench Safety 2335 If $ 0.75 $ 1,751.25 Subtotal Wastewater $ 72,740.00 Item Quantity Unit Price Storm Sewe 1 36" RCP CL 3 29 If $ 56.00 $ 1,624.00 2 33" RCP CL 3 142 If $ 50.00 $ 7,100.00 3 24" RCP CL 3 135 If $ 37.00 $ 4,995.00 4 21" RCP CL 3 42 If $ 33.00 $ 1,386.00 6 10' Curb Inlets 5 ea $ 2,200.00 $ 11,000.00 6 33" Type B Headwall 1 ea $ 1,000.00 $ 1,000.00 7 36" Type B Headwall 1 ea $ 1,100.00 $ 1,100.00 8 Trench Safety 1 Is $ 365.00 $ 365.00 Subtotal Storm Sewer $ 28,570.00 Subtotal Project $ 151,732.50 Material Taxes $ 5,541.00 Bonds $ 3,710.00 Total Project $ 160,983.50 4 August 2, 2000 Lexington Properties Management attn: Kelly Jordan 2639 Walnut Hill Lane, Suite 200 Dallas, Texas 75229 Gentlemen: PROPOSAL We propose to furnish all labor, materials and equipment to construct, as an independent contractor, the following described work: DESCRIPTION AND LOCATION: 6" LIME STABILIZATION HYDRATED LIME 6 "3000# CONCRETE PAVING WHEEL CHA S'� AC PAVEMENT Windsor Estates Coppell, Texas 3,925.00 ITY T UNIT PRICE AM $1.50 $5,887.50 $91.50 $6,496.50 $21.65 $56,051.85 11112.25 $1,224.50 $19. 16,476.53 x.00 TONS YD 2.00 EACH 838.50 SY Windsor Estates ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 6" LIME STABILIZATION 6, 335.00 HYDRATED LIME 114.00 6 "3000# CONCRETE PAVING (28') 5, 234.00 WHEEL CHAIR RAMPS 2 6" HMAC PAVEMENT 838.5 This Proposal is subject to the "Bid Qualifications" attached Austin Bridge & Road An Austin Industries Company Austin Bridge & Road, Inc. D/FW Paving Division 11143 Goodnight Lane Dallas, Texas 75229 -4412 972 -484 -8863 972 - 445 -5173 (Metro) 972 -406 -8256 (Accounting Fax) 972 -406 -8243 (Estimating Fax) SID YD $1.50 $9,502.50 TONS $91.50 $10,431.00 SQ YD $21.65 $113,316.10 EACH $612.25 $1,224.50 SY 19.65 $16,476.53 TOTAL.......... $150,950.63 These prices are contingent on both projects being done together. Your acceptance of this proposal by signing and returning the original copy to us within (10) ten days and the approval by us of credit arrangements will constitute a contract.