Loading...
ST0001-CS020612Suzan Tayl~'~ ~'~e~l~view From: To: Date: Subject: "Schnitger, Chris" <cschnitger@sradesign.com> "Suzan Taylor (staylor@ci.coppell.tx.us)" <staylor@ci.coppell.tx.us> Wed, Jun 12, 2002 10:43 AM Creekview Suzan, I just spoke to both Larry and Philip. Larry asked me to send you a letter regarding the curb inlets. I will get that to you shortly so that ISl can proceed with the construction of the curb inlets. Larry also said that he doesn't have a problem with ISI starting with the construction of the sidewalk at the west end of the project. We should have some excavation quantities by the end of the day on the berm areas. Philip is aware that there will probably be some excavation involved in the "berm" area and he has already indicated that there is a bid price of a $1/CY. I hope to have the excavation numbers by the end of the day. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX 8176497645 06/12/2002 11:15 8176497645 SCHRICKEL ROLLINS PAGE 01 Schrickel, Rollins and Associates, .Inc. sm oo-oi Consultants in Landscape Architecture * Engineering · Planning June 12,2002 # oi Post-iff Fax Note 7671 o&te ~. ~__~-]._ [pagea#, Phone ~ Phone ~1~ ~12 Pax~ ~%. 5~. 5~'~ Fax, (81~9-7~ Ms. Suzan Taylor City of Coppell Engineering Dept. P.O, Box 476 CoppeII, Texas 75019 Kent E. Besley, ASLA Joseph E. Bradley, 2E Terry T. Cheek, ASLA Terry E. Cul]end~r Dino J FerralJi, P~ Daniel B Hartm~, PE Delbert W. Hrr5~ ASLA 5an¢or~ P. LaHu~, jr. P[ Hershel R Lindly, APA David K. McCa~kill, ASLA Robert M. Otey, PE Albert W Rolhns, PE Christian SChni[~er. PE Gene Schrickei, F&SL A Suzanne C. 5~eek RE: Creekview Drive and Freeport Parkway The following letter is in response to the information that SRA received regarding the curb inlet locations and elevations on Creekview Drive. SRA has review the information provided by ISI and it appears that although the curb inlets are not in the locations indicated on the construction plans, they will still function as designed, Qnce the curb inlets are complete and in place they will need to be observed to verify that there aren't any intermediate high points affecting drainage to the curb inlets. ISI will need to address any imperfections that occur once the inlets are in place. If you should have any questions regarding this matter please do not hesitate to give me a call. Yours truly, SCHRICKEL, ROLLINS AND ASSOCIATES, INC. Chris Schnitger, P.E. CS/cs/4~2~ CC: Philip Bennett 116 ! Corporate Dave West · Suite 200 - Arlington, Texaf 76006 · 18 i 7) 649-;~216/Metro ($17) 640-82 ~ 2,/FAX i8171 64§-7645