I just spoke to both Larry and Philip. Larry asked me to send you a letter
regarding the curb inlets. I will get that to you shortly so that ISl can
proceed with the construction of the curb inlets. Larry also said that he
doesn't have a problem with ISI starting with the construction of the
sidewalk at the west end of the project. We should have some excavation
quantities by the end of the day on the berm areas. Philip is aware that
there will probably be some excavation involved in the "berm" area and he
has already indicated that there is a bid price of a $1/CY. I hope to have
the excavation numbers by the end of the day.
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX
8176497645
06/12/2002 11:15 8176497645 SCHRICKEL ROLLINS PAGE 01
Schrickel, Rollins and Associates, .Inc.
sm oo-oi
Consultants in Landscape Architecture * Engineering · Planning
June 12,2002
# oi
Post-iff Fax Note 7671 o&te ~. ~__~-]._ [pagea#,
Phone ~ Phone ~1~ ~12
Pax~ ~%. 5~. 5~'~ Fax, (81~9-7~
Ms. Suzan Taylor
City of Coppell
Engineering Dept.
P.O, Box 476
CoppeII, Texas 75019
Kent E. Besley, ASLA
Joseph E. Bradley, 2E
Terry T. Cheek, ASLA
Terry E. Cul]end~r
Dino J FerralJi, P~
Daniel B Hartm~, PE
Delbert W. Hrr5~ ASLA
5an¢or~ P. LaHu~, jr. P[
Hershel R Lindly, APA
David K. McCa~kill, ASLA
Robert M. Otey, PE
Albert W Rolhns, PE
Christian SChni[~er. PE
Gene Schrickei, F&SL A
Suzanne C. 5~eek
RE: Creekview Drive and Freeport Parkway
The following letter is in response to the information that SRA received regarding the
curb inlet locations and elevations on Creekview Drive. SRA has review the
information provided by ISI and it appears that although the curb inlets are not in the
locations indicated on the construction plans, they will still function as designed,
Qnce the curb inlets are complete and in place they will need to be observed to verify
that there aren't any intermediate high points affecting drainage to the curb inlets. ISI
will need to address any imperfections that occur once the inlets are in place.
If you should have any questions regarding this matter please do not hesitate to give
me a call.
Yours truly,
SCHRICKEL, ROLLINS AND ASSOCIATES, INC.
Chris Schnitger, P.E.
CS/cs/4~2~
CC: Philip Bennett
116 ! Corporate Dave West · Suite 200 - Arlington, Texaf 76006 · 18 i 7) 649-;~216/Metro ($17) 640-82 ~ 2,/FAX i8171 64§-7645