ST0001-CS020611[ ~i~?~n~Ta)'lor - Creekview Ddve Page 1 t
From:
To:
Date:
Subject:
"Schnitger, Chds" <cschnitger@sradesign.com>
"Suzan Taylor (staylor@ci.coppell.tx.us)" <staylor@ci.coppell.tx.us>
Tue, Jun 11, 2002 3:11 PM
Creekview Drive
Suzan,
I finally had a chance to study the information you sent over regarding the
curb inlets. I even spoke to another engineer here in our office about it
and both of us agree that the Contractor should go ahead and pour the inlets
where they are. The elevation differences are so minor that it is difficult
to determine if there is going to be any significant drainage problems. The
Contractor will need to make sure that the leave- out areas are centered
with the inlets though. After the inlets are in place we will need to
inspect them, after a rain, to determine if there are any minor high points
that the Contractor will need to shave down.
We should have some excavation figures associated with the sidewalk design
by tomorrow.
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX
From,'
To:
Date:
Subject:
"Schnitger, Chris" <cschnitger@sradesign.com>
"Suzan Taylor (staylor@ci.coppell.tx.us)" <staylor@ci.coppell.tx.us>
Tue, Jun 11, 2002 4:41 PM
Creekview
Suzan,
I just got the fax from ISI regarding the inlets and the sidewalk. I tried
to call him but he is out for the day. I asked him to call me back in the
morning. They can proceed with the inlets and from what I can tell we are
going to proceed with the sidewalk design as we have it. I was going to
tell Philip to start looking at the sidewalk plans. We are going to get you
some excavation quantities tomorrow. Do you want me to tell Philip to
proceed with the curb inlets?
Chris
Chds Schnitger, P.E.
Schdckel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649-3216
(817 649-7645 FAX