Loading...
CF-Coppell Rd SC-LR020529Hooper Engineering Laboratories, Inc. Construction REPORT OF MORTAR/GROUT TESTS CLIENT: Texas Unified Constructors, Inc. PROJECT: F--ield Service offices & Maintenance Fac. Coppell, TX LOCATION OF POUR SET 1: l~~terials Tes~n g SUPPLIER: LOCATION OF POUR SET 2: 01.1054 29 May 2002 Quality Masonry Block wall at utility buildi~ng~ast wall, 12'-14' above finished slab, from grid line Atr SAMPLE DATA: SET 1 Truck No. Ticket No. Time Batched 9:00am Time Sampled 9:15am Mortar Temp. IASTM C1064) 72°F Air Content (ASTM C173) Unit Weight {ASTM C138) SET 2 MIX NO. Type "S" Mortar Cement Cement Sand in. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 2 inch x 2 inch x 2 inch Cube) Cube Flow Age Test Number % Days Date Total Load Compressive Required Pounds Strength 2S-Day psi Strength 250 7 06/05/01 251 28 06/26/01 252 28 06/26/01 10,400 2600 2S-Day Average 1800 TECHNICIAN: DISTRIBUTION: TMC (8:30am-10:30am) (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF MORTAR/GROUT TESTS CLIENT: Texas Unified Constructors, Inq. - PROJECT: Field, Service Offices & Maintenance Fac. C~l~ell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 01.1054 DATE: 29 May 2002 SUPPLIER: Quality Masonry Block wall at utility building;~ast wall, 12'-14' above finished slab, from grid line A to D SAMPLE DATA: SET 1 Truck No. Ticket No. Time Batched 9:00am Time Sampled 9:15am Mortar Temp. (ASTM C1064i 72°F Air Content (ASTM C173) Unit Weight (ASTM C1381 SET 2 MIX NO. Type "S" Mortar Cement Cement Sand in. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 2 inch x 2 inch x 2 inch Cube) Cube Flow Age Test Number % Days Date Total Load Compressive Required Pounds Strength 28-Day psi Strength 250 ,.,, 7 06/05/01 10,400 251 2~'28 06/26/01 13, §0.Q 252 ~ 06/26/01 ~L3 ,gQQ 28-Day Average 3440 1800 TECHNICIAN: DISTRIBUTION: TMC (8:30am-10:30am) (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc, 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148