CF-Coppell Rd SC-LR020529Hooper Engineering Laboratories, Inc.
Construction
REPORT OF MORTAR/GROUT TESTS
CLIENT: Texas Unified Constructors, Inc.
PROJECT: F--ield Service offices & Maintenance Fac.
Coppell, TX
LOCATION OF POUR SET 1:
l~~terials Tes~n g
SUPPLIER:
LOCATION OF POUR SET 2:
01.1054
29 May 2002
Quality Masonry
Block wall at utility buildi~ng~ast wall, 12'-14' above finished
slab, from grid line Atr
SAMPLE DATA: SET 1
Truck No.
Ticket No.
Time Batched 9:00am
Time Sampled 9:15am
Mortar Temp. IASTM C1064) 72°F
Air Content (ASTM C173)
Unit Weight {ASTM C138)
SET 2 MIX NO. Type "S" Mortar
Cement
Cement
Sand
in.
1.0 in.
Water
Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39)
(Standard 2 inch x 2 inch x 2 inch Cube)
Cube Flow Age Test
Number % Days Date
Total Load Compressive Required
Pounds Strength 2S-Day
psi Strength
250 7 06/05/01
251 28 06/26/01
252 28 06/26/01
10,400 2600
2S-Day Average 1800
TECHNICIAN:
DISTRIBUTION:
TMC (8:30am-10:30am)
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors,
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF MORTAR/GROUT TESTS
CLIENT: Texas Unified Constructors, Inq. -
PROJECT: Field, Service Offices & Maintenance Fac.
C~l~ell, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 01.1054
DATE: 29 May 2002
SUPPLIER: Quality Masonry
Block wall at utility building;~ast wall, 12'-14' above finished
slab, from grid line A to D
SAMPLE DATA: SET 1
Truck No.
Ticket No.
Time Batched 9:00am
Time Sampled 9:15am
Mortar Temp. (ASTM C1064i 72°F
Air Content (ASTM C173)
Unit Weight (ASTM C1381
SET 2 MIX NO. Type "S" Mortar
Cement
Cement
Sand
in.
1.0 in.
Water
Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS IASTM C39)
(Standard 2 inch x 2 inch x 2 inch Cube)
Cube Flow Age Test
Number % Days Date
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
250 ,.,, 7 06/05/01 10,400
251 2~'28 06/26/01 13, §0.Q
252 ~ 06/26/01 ~L3 ,gQQ
28-Day Average
3440 1800
TECHNICIAN:
DISTRIBUTION:
TMC (8:30am-10:30am)
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc,
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148