Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Gateway BP(1.4)-CS011015 (2)
1st Review I pie Comments Recieved: i tilt- r '--1\ Sent to Utilites /Streets: C v Reviewed By Larry /Garreth: VP epr ji ciArpi X in Returned to Engineer: i l Lvtrr+2 1 kit., 2nd Review I Date: Comments Recieved: 2J/(1 )U ��JJ PUT Ai LICvri<c,l izocr -tit Sent to Utilites /Streets: A Al. I41.n s Reviewed By Larry /Garreth: a Returned to Engineer: 3 I LUAU I 3rd Review at e: Comments Recieved: 4.-'4 t 1i j b 7041 EA! 17RO(lPeo Sent to Utilites /Streets: Reviewed By Larry /Garreth: Returned to Engineer: vt. ctt •4■ �+A1, I 1/44/ L`A err 641 B if./ G ffYiellikt, L: VfA l r a J v1 vr. 1 a /1/ C aY�¢.- L 1 Project Name Engineer: 11 SO U Developer: Reviewed By: 4. 16) (L2 ti s�,� C i FIA\/ ©Z Date: Comments Fees Paid: Water Sewer 'Roadway Inspection /0.12.01 Plans Approved: /p (�j .01 Lvtrr+2 1 kit., A Al. I41.n s a err 641 B if./ G ffYiellikt, L: VfA l r a J v1 vr. 1 a /1/ C aY�¢.- L 1 Project Name Engineer: 11 SO U Developer: Reviewed By: 4. 16) (L2 ti s�,� C i FIA\/ ©Z