Loading...
TR0001-CS020529 (2)T H E C 1 T Y • O F COPPELL e x n 6 g 4 May 29, 2002 Billy R. Sanders, Vice President Sharrock Electric, Inc. 6801 -B Old Randol Mill Rd. Fort Worth, TX 76120 RE: Traffic Signal Installation Natches Trace at Denton Tap Road Project # TR 00 -01 Dear Mr. Sanders: At the May 28, 2002 City Council meeting, the referenced project was awarded to your firm. Enclosed with his letter are three original contract documents. Please execute the three originals; provide the required bonds and return two of the originals to the Engineering Department. One of the copies is for your file. As per the contract, construction should begin on June 3, 2002 and the traffic light must be operational by August 19, 2002. Once you have returned the contract documents, you will receive an official notice to proceed and a preconstruction meeting will be scheduled. If you have any questions feel free to call Garreth Campbell, the inspector on this project, at (972) 304 -3685. Sincerely, X ... 1 � th M. Griffin, P.E. Director of Engineering/Public Works Office 972/304 -3686 Fax 972/304 -7041 TIOO -OI beginAtr 255 PARKWAY * P.O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673