Loading...
Freeport NIP(7.9)-CS020617June 17, 2002 Jeff Langston Duke Construction 5495 Belt Line Road Suite 360 Dallas, TX 75240 Dear Mr. Langston: Sincerely T H E C 1 T Y O F COPPELL RE: Duke Freeport Addition, Lot 5, Block A (U -line, Inc.) Enclosed is a copy of the City of Coppell Development Fee Assessment Table, along with a copy of the Development Fee calculations for the referenced development. There are no fees due prior to Council approval. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer fees until the issuance of a Building Permit. Construction Inspection fees based on the Engineer's estimate or contract will be due prior to the scheduled pre construction meeting. Please provide a copy of the Engineer's estimate or contract to this office so that the 2% and 4% construction inspection fee can be verified. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of the project. We look forward to working with you on this project. If you have any questions, please feel free to contact me at your convenience. J Kenneth M. Griffin, P.E. Director of Engineering Public Works Office Phone: (972) 304 -3686 Fax: (972) 304 -7041 cc: Jennifer Armstrong, Finance Director Greg Jones, Building Official Glenn Hollowell P.E., Asst. Dir. of Public Works Rhonda Brothers, Engineering Secretary 9 255 PARKWAY P.O.BOX 478 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Duke Freeport Addition Lot 5, Block (U -Line, Inc.) Date: June 14,2002 Water Impact Fee (100% due at Issuance of Building Permit) Water Tap Inspection Fee (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit (100% due at Issuance of Water Meter) Wastewater Impact Fee (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee (100% due at Issuance of Building Permit) Park Fee (100% due prior to Council Approval) Roadway Impact Fee '(100% due prior to Council Approval) Street Light Fee (100% due prior to Acceptance of Project) Street Sign Fee (100% due prior to Acceptance of Project) Construction Inspection Fee (100% due prior to Start of Construction) TOTAL TOTAL FEES DUE $5,180.00 $200.00 $205.28 $4,390.16 $30.00 $90.00 $2,240.00 $50.00 $50.00 $0.00 0.0 0 $12,435.44 AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 $0.00 Information not Available II Information not Available II Information not Available I II $0.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL Service Area 4 Category Industrial Land Use General Light Industrial Building Area (sf) 159,168 Development Units 159.17 Vehicle Miles per Development Unit 1.06 Fee per Vehicle Mile $300 Roadway Impact Fee due (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $50,615.42. ROADWAY IMPACT FEE: ROADWAY IMPACT FEE CALCULATIONS PROJECT: Duke Freeport Addition Lot 5, Block A (U -Line, Inc.) DATE: June 14,2002 (Figure 2 Roadway Impact Fee Study) (Table 3 Roadway Impact Fee Study) (Schedule 2, Page 3 Roadway Impact Fee Study) 100% $50,615.42 Percent of Credit Toward Roadway Impact Fees Total Credit AMOUNT DUE: $0.O0I DEVELOPMENT FEE WORKSHEET PROJECT: Duke Freeport Addition Lot 5, Block A (U -Line, Inc.) DATE: June 14,2002 Water Impact Fee: Domestic Meter(s): 1 2 inch 8 ESU's Irrigation Meter(s): 1 2 inch 8 ESU's 0 0 ESU's Fireline Meter(s): 2 8 inch 2.5 ESU's Total 18.5 ESU's $280.00 ea. $5,180.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total 4 Connections $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 1 Domestic Meter(s) $205.28 (Single family due prior to issuance of building permit) (AR other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 1 Irrigation Meter(s) Co3 Total 0 Additional Irrigation Meter(s) Total 2 Fireline Meter(s) (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total 1 Meter(s) Q $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 3 Meter(s) Cot $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 $280.00 ea. $2,240.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total 1 Connections Cat $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 1 Lots Cot $50.00 ea. (100% due prior to issuance of building permit) Page 1 $205.28 $0.00 $2,092.44 $200.00 $205.28 $205.28 $0.00 $4,184.88 $30.00 $90.00 $50.00 $50.00 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): Preliminary plat approved: 0 Single- family $0.00 per lot 0 Multi- family $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: $0.00 (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right -of -way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right -of -way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 $0.00 $0.00 Information not Available Information not Available Information not Available