CF-Coppell Rd SC-LR020510Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REINFORCING STEEL PLACEMENT INSPECTION
CLIENT: Texas Unified Constructors, Inc.
DATE: 10 May 2002
PROJECT: Field Service Offices & Maintenance Facility JOB NO. 01.1054
Coppell, TX
TIME: 2.0 hours
AREA INSPECTED: Slab on metal deck, mezzanine level of main building,
on columnline 7 to 8 and line C to F
DATE OF INSPECTION: 6/10/02 (2:30pm-4:30pm)
DEFICIENCIES NOTED:
CORRECTIONS
NUMBER LOCATION/ITEM DESCRIPTION OBSERVED
Lap splices not correct.
V~NF in-place is 6"x6" and not 4"x4" as per drawing required.
NOTE:
Superintendent aware of reinforcing not placed as per
specifications. Reinforcing to be removed and replaced at a
laater date, per superintendent.
TECHNICIAN:
DISTRIBUTION:
EWM
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.