Gateway BP(1.4)-CS020612Halff Associates
ENGINEERS ARCHITECTS SCIENTISTS
PLANNERS SURVEYORS
June 12, 2002
AVO# 19266
City of Coppell
Department of Engineering Public Works
255 Parkway Boulevard
P.O. Box 478
Coppell, Texas 75019 -4409
Attn: Mr. Larry Davis
RE: Gateway Business Park, Lot 1R, Lot 2R Lot 3
Haverty's Drainage Improvements Exchange Circle Reconstruction
Dear Mr. Davis:
Attached please find seven full size sets and three half size sets of engineering drawings
for the above referenced project. The plans were approved by Kenneth Griffin, P.E., last
fall. See the attached letter dated October 15, 2001.
The contractor for this project will be John Burns Construction. The contractor would
like to schedule the pre construction meeting as soon as possible. Please stamp all sets
for construction and keep three full size sets for your use. The remaining sets can be
distributed to the contractor at the pre construction meeting.
If you have any questions or need additional information please call me at (214) 346-
6249.
HALFF ASSOCIATES, INC.
Pia41.Paic;
Marty S. Paris, P.E.
Project Manager
cc: Robert McCann, Catellus Development Group
DALLAS FORT WORTH HOUSTON McALLEN
TRANSPORTATION WATER RESOURCES LAND DEVELOPMENT MUNICIPAL ENVIRONMENTAL STRUCTURAL
MECHANICAL ELECTRICAL SURVEYING GEOGRAPHIC INFORMATION SYSTEMS
ARCHITECTURE LANDSCAPE ARCHITECTURE PLANNING
8616 NORTHWEST PLAZA DRIVE
DALLAS, TEXAS 75225
(214) 346-6200
FAX (214) 739.0095
October 15, 2001
Marty Paris, P.E.
Halff Associates
8616 Northwest Plaza Drive
Dallas, TX 75225
RE: Gateway Business Park, Lot 1R
Haverty's Drainage Improvements Exchange Circle Reconstruction
Construction Plan Review Comments
Dear Mr. Paris:
The City of Coppell has reviewed the revised plans for the referenced project. These plans meet
our current minimum construction requirements, however, prior to beginning construction the
following items need to be completed:
1. Three sets of construction plans for the City's use and any copies necessary for your
contractors in the field should be submitted for City Engineer's seal prior to the beginning of
construction. At that time, the Construction Development Permit form should be filled out
by the appropriate responsible party and returned with the plans. [Form enclosed]
2. All construction inspection fees should be paid. The fees are calculated at 2% for private
improvements and 4% for public improvements.
3. A pre construction meeting should be coordinated with the inspector for this project, Larry
Davis. He can be reached at 972 304 -3684.
If you have any questions, please contact this office at your convenience.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering Public Works