Loading...
ST0001-LR0206128908 Ambassador Row Client: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: Dallas, Texas 75247-4510 one E n g i neers (214) 630 -9745 - (214) 630 -9819 (fax) Report Date: CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 149754 Project No.: 015729 Date of Service: 05/14/2002 Report Date: 06/12/2002 Project: Creel i Drive and Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 6 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP (in): 3" - 5" AIR ( %): 3%-5% TEST METHOD: ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 MIX DESIGN I.D.: 42 PLACEMENT DATE: 05/14/2002 WEATHER CONDITIONS: Clear TIME SAMPLED: 8:50am BATCH TIME: 7 :59am TEMPERATURE (F) -AIR 65 F CONCRETE: 85 F TRUCK NO: 761 TICKET NO: 617486 AIR CONTENT ( %): 4.25 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving - west side approachment and State Road intersection going into west parking lot of Wagon Wheel baseball park SAMPLE LOCATION: 10' north x 8' east of southwest r: ASTM C -39 REPORT OF TESTS comer o tmersectton Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP DATE ES Q T NO. (inches) TESTED 1 1 3.0 05/17/2002 1 2 3.0 05/21/2002 1 3 3.0 06/11/2002 1 4 3.0 06/11/2002 1 5 Hold AGE (days) 3 MAXIMUM LOAD (Ibs. force) 100485 113220 147320 142815 Average COMPRESSIVE STRENGTH (Psi) 3550 4000 C210 FRACTURE Unbonded Cap Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. O1DK Page 1 of 2 Report No.: 149754 Project No.: 015729 Client: City of Coppell RoneEngineers CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) Water added at site: 10 gallons Standby from 10:30 to 12:00 waiting for concrete. Technician: Anthony Maldonado Report Distribution: (1) City of Coppell (1) City of Coppell (l) City of Coppell (l) Infrastructure Services, Inc. Started: 7:3Oam Finished: 122 (1) City of Coppell (1) Scbrickel, Rollins & Assoc., Inc. MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (ibs. force) (psi) TYPE LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. O1DK Page 2 of 2