Loading...
Amberpoint BP-LR020611REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0290 Service Date: May 29, 2002 8901 Carpenter Fnvy,, Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: June 11, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services: Drilled belled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet for recorded data. Technician: Brad Rengstorff Report Distribution: (1) Transwestem Comrnemial Sen, ices (1) O'Brien & Associates Inc (1) TechniStructures Inc (1) City of Coppell - Constr Insp (1) City of Coppell - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates (1) State Farm Insurance Reviewed by: Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively fur the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracen. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of I ~-~,~,~