Loading...
PA9702-LR 990927CONCRETE COMPRL SIVE STRENGTH TES 8901 Carpenter Frwy., Suite gl00 Dallas, Texas 75247 Date of Service: 09/16/1999 Report No.: 9925128 Report Date 09/27/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, TexasfPrj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPpLIER: Nelson Brothers PLACEMENT DATE: 09/16/1999 BATCH TIME: N/A PLANT: Lewisville T~a~ SAMPLED: 10:45AM EY: Dean Martin SPECIFICATION REQUIREMENTS WEATHER CONOrrIONS: Cloudy STRENGTH: 4000 psi @ 28 Dayg TEMPERATURE (F)- AIR 78 F CONCRETE: 86 F SLUMP: 6.0" MAX TRUCK NO: 217 TICKET NO: 77680 AIR: N/A AIRCONTENT(%): N/A UNrrWEIGHT(pct~: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Piers dated 9-16 ASTM C- 172 ASTM C-31 SAMPLE LOCATION: G-~t, F-3 REPORT OF TESTS ACCUMULATIVE YARDS: 50 CYLINDER MEASURED MAXIMUM COMPRESSfiE MARKED SLUMp DATE AGE LOAD STRENGTH FRACTURE SET NO, (inch~) TESTED (days) (Ibs. force) (psi) TYPE 1 1 5.75 09/23/1999 7 87260 3090 1 2 5.75 09/23/1999 7 87910 3110 Average 3100 1 3 5.75 10/14/1999 28 1 4 5.75 10/14/1999 28 1 5 5.75 11/11/1999 56 Technician Time: See Report #9925127 Technician: Dean Martin Started: Finished: ~ . Report Distribution: ~glneerlng, Inc. (1) City of Coppell (1) City of Coppell - Engineering (I) BrinkIcy Sargent Architects (1) City of Coppell - Bldg. lnsp. Eugene Harbour (1) Turner Engineers (1) City of Coppell - Leisure Serv Dcpt Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wriaen approval of HBC Engineering, Inc. 01TM Page 1 of I