Northpoint Dr-LR020612REPORT OF CONCRETE OBSERVATION ~~ Qa~wr~4r,r.~.~
Report Number: 94021061.0045 crx;rx~lerrtG
Service Date: May 29, 2002 asol carpenter Frwy., suite #100
Dallas, Texas 75247
(214) 630-1010
Client: Transwestern Commercial Services Report Date: June 12, 200
Attn: Jim Gaspard Project: North oint Drive 8~
5001 Spring Valley Rd Suite 600W sso e s
Dallas TX 75244
Coppell, Texas
Project Number: 94021061
Services: Concrete observation.
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
concrete observation. After arriving at the jobsite, HBC's technician was notified that the
concrete observation for this date was cancelled due to the ground was too wet for the concrete
placement.
~~e
~•2l"~~~
Technician: Marvin Arandia
Report Distribution:
(1) Transwestern Commercial Services
(1) Glenn Thurman Inc
(1) Halff Associates
(1) City of Coppell -Engineering
(1) City of Coppell -Bldg Insp
(1) State Farm Insurance
(1) Moss Construction
Reviewed by.
Eugene Harbour
Principal
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test resuRs transmitted herein are onty applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
HBC E Bering
Page 1 of 1 ,o-saueas,e..~w