Creekview II P1-CS 930902® n
~~~/~ /'~ /Z__ P.O. Box 478
//~(~ Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
Creekview Estates Limited Partnership September 2, 1993
8333 Douglas Avenue, Suite 1510
Dallas, Texas 75225-5811
;~~ ~„ ..:
RE•
Development Fee Assessent
Dear Sir:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the
development fee calculations for Lot 1, Block A and Lots 1 and 3, Block B of Creekview Estates II.
Please pmvide a check made payable to the City of Coppell in the amount of $3,300.00 and forward
it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. The
remaining monies due are payable at the time of building permit or the issuance of meters.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify
payment of the required fees and assure a successful beginning of this project.
Please note that Section 1.06 of Ordinance 91533.1 (Impact Fees) states "No final plat shall be approved
unless the applicant has paid the impact fee imposed by and calculated hereunder". In this case, the
impact fee due for all four lots must be paid before the plat can be released to be filed at the county.
This includes the amount due by both Greg Gemoules and Creekview Estates Limited Partnership.
If you should have any questions, please do not hesitate to contact me.
Sincerely,
Katneth M. Griffin, P.E.,
City Engineer
cc: Steve Gomm, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Peter G. Smith, City Attorney develmtlcrkview.foe
/'~ r1
CITY OF COPPELL
DEVELOPMENT FEES
Date: August 24, 1993
Project: Creekview Estates II Lot 1, Block A & Lots 1 & 3, Block B
Water Impact Fee
(100% due prior to Council Approval)
Water Tap Inspection Fee
(100%due at Issuance of Building Permit)
Wastewater Impact Fee
(100% due prior to Council Approval)
Utility Final Inspection Fee
(100%due at Issuance of Building Permit)
Water Meter Fee (L.ots)
(100%due at Issuance of Building Permit)
Water Meter Fee (Irrigation)
(100%due at Issuance of Water Meters)
Water Meter Deposit
(100%due at Issuance of Building Permit)
Irrigation Meter Deposit
(100%due at Issuance of Water Meters)
TOTAL
TOTAL AMOUNT DUE PRIOR. TO
COUNCII. APPROVAL
AMOUNT DUE
PRIOR TO
TOTAL. COUNCII.
APPROVAL
$ 1,950.00 $ 1,950.00
$ 300.00 -0-
$ 1350.00 $ 1,350.00
$ 150.00 -0-
$ 66.75 -0-
s ~
$ 105.00 -0-
* -0-
$ 3,921.75 S 3,300.00
$ 3,300.00
s Irrigation Foes to be determined
at the time of development
/'"~
COPPELL PUBLIC WORKS
IyEDJORIINDUlf
+~C GM A~~s hn MI ~C
al~l4//~ ~ K+~
DATB: August 23, 1993 '~ r ijf'~~~
TO: ~~rrM~~ike Martin, Graduate Engineer A~1~~• ~~
FROX: ?,lT~ste en G. Goram, Diector of Public Works ~T I ~~~ ~~
RS: evelopment Fees for Creekview Estates II
The following fees should be assessed on the above referenced
project.
Water Impact Fee: G~ C tcp
~_ - %" x ~" Domestic Meter/s = ~_ ESU's
~_ - %M x ~p Irrigation Meter/s ~_ ESU's ~ ~
Total ~ ESU's @ $650.00 ea _SitiiM~i~YP ?'
100$ due prior to Council approval of final plat.
Wastewater Ispact (City)
_Z4' - %p X ~iM Residential meters = 3 ESV's ~ 3
Total ~~' ESU's @ $450.00 ea = ' ~~~
100 due prior to Council approval of the final plat.
water Tap Inspection Fee
SOO.OG
Connections @ $100.00 each = S ~rAe' Z. 3
100 due prior to issuance of building permit. (Or in the case of
the irrlgatlon meter-prior to issuance of aster).
i00$ due prior to issuance of building permit.
Utility Final Inspection Fee
Zf70.00
~4 lots @ ,550.00/lot = Sxa~aa 1 3
100$ due prior issuance of batlding permit.
~K ~~~+ds ~eea be~w~eh ~et~ty ~ew-a+-1~s ~OwN~ o~ Lo1~t
41o.k b~ A~e~ ('Pt~okvilw ~tr~s Liw-~~f~ w~-r~'~b,IP~twwrr-
++ Lot - 4l«atA ~ 6o~S I ~3 41a.1c 8~,
Development Fees
Page z Gi~ C.ELP
Water Meter Fee (Lots)
41.00
- 4fi" x ~i" Domestic Meters @ 522.25 ea = ~ 3
100$ due prior to issuance of building permit.
water Meter Fee (Irrigation)
- 46° x fir" Irrigation Meters @ 522.25 ea = 522.25 ` 0
- __~_.
ss.xs
Total =
100$ due prior to issuance of water meters.
Water Meter Deposit Co'merciel
Residential - ~ meters @ 5 35.00 ea = S1iai~..40 ' 3
100$ due prior to issuance of building permit.
Irrigation Meter Deposit
~_ - ~" meters @ 535.00 ea = ~_ ' 0
o~
Total S 3S
100$ due prior to Issuance of water meters.
CRSSICVII.HLP
~~