Nash Manor-CS020626T N t C I T Y O R
COPPELL
r o
e x A a ~ s 4
June 26, 2002
/ Mark Donohue, P.E.
Jones & Carter, Ina Consulting Engineers
12000 Ford Road, Suite 180
Dallas, TX 75234
RE: Nash Manor
Preliminary Walk-thru
Deaz Mr. Donohue:
Please be advised that a preliminary walk through has been scheduled for Wednesday, July 3rd at
10:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities aze clean and accessible at that time and that contractor's
representatives aze present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call 972-304-7090 at your eazliest convenience.
Sincerely
~~~~
~~k O'Dell
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972) 304-3570
Post-IP Fax Note 7671 oar ~ O -
To L(_ ~?.~ ~ L From ~ ~ ~ u_
CoJDapt. Co.
Pnorre • jZ O ~ ~
F _ t~ L Fax a1
~: Works
/ Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
,/ Lee Stone, Commercial Inspector
Travis Crump, Fire Mazshal
Roland Asebedo, Asst. Fire Mazshal
v Bill Koziol, JR Holdings fax 972-745-0587