Loading...
Amberpoint BP-LR020628LABORATORY COMPACTION CHARACTERISTICS OF SOIL Report Number: 94021029.0307 Service Date: June 18, 2002 Client: Transwestem Commemial Services Attn: Jim GasPard 5001 Spring Valley Rd Ste 600W Dallas TX 75244 Report Date: June 28, 2002 Project: Amberpoint Building No. 1 8901 Carpenter Fn~/., Suite #100 Dallas, Texas 75247 (214) 830-1010 Amberpoint Bus. Pk. ~ Coppell Coppell, TX Project Number: 94021029 Material Information Contractor: Hill & Wilkinson Source of Material:Off-site borrow Proposed Use: Select Fill Laboratory Test Data Test Procedure: Test Method: Sample Preparation: Rammer Type: ASTM D 698 Method A Moist Method Mechanical Maximum Dry Unit Weight, pcf: 123.1 Optimum Water Content, %: 10.1 Sample Information Sampled By: Hughes, Bryan Sample Location: Imported material stockpiled behind tilt wall Sample Description: Reddish tan clayey sand Liquid Limit: Plastic Limit: Plasticity Index: % Passing ~200: % Passing #40: USCS: Moisture Density Relations Result Specifications 25 15 10 Zero Air Voids Curve for assumed specific gravity 2.65 Services. Moisture-Density Relations Technician: Bryan Hughes Report Distribution: (1) Trenswestern Commemial Ser/ic, es (1) o'~en & Aeson (1) TechniStructursa (1) c~y of Cpppell - Constr Inpp (1) c~y of coppe~ - Bldg In~p (1) Hill & Wilkinson (1) Halff Aesoc In(= (1) State Farm Insurance Reviewed by:. E Eugene Harbour Prmip~ The tests were performed in general ag~ordance with applicabis ASTM, AASHTO, or DOT test methods. This report is exclualvety for the uae of the client indicated above and shall not be reproduced except in full without the written approval of Te~. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ~.~,~, CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0310 Service Date: June 20, 2002 Client: Transwestem Commemial Services Attn: Jim Gasperd 5001 Spdng Valley Rd Ste 600W Dallas TX 75244 8901 Carpenter Fha/., Sul~e #100 Dallas, Texas 75247 (214) 630-1010 Report Date: June 28, 2002 Proje¢~ng No. 1 Coppe, Coppell, TX Project Number: 94021029 Material Information Specified Strength: 4000 psi ~ 28 Days Batch Time: 4:33am Supplier: Potter Track No: 104 Mix I.D. No.: 7752 Plant: 16 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Ticket No: 614136 Sample Information Sample Time: 4:33am Date Cast: June 20, 2002 Technician: Marvin Arandia Weather Conditions: Clear Accumulative Yards: 30 Placement Method: Pump Sample Locations: See placement location Placement Location: Pavement- S & SE of building (See attached sketch) Result Specification Test Method 5.00 ASTM C-143 82 ^STM C1064 76 ASTM C-1064 Age at Date Test Tested (days) Set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 06/27/2002 7 I 2 6.00 28.27 06/27/2002 7 121,780 Average I 3 07118/2002 28 1 4 07/1812002 28 Maximum Compressive Load Strength (~bs) . (ps0 126,650 F 4,480 ' llk~,310 4,400 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were petformod in general accordance with apl~iceble ASTM, AASHTO, or DOT test methods. This report is exc, luslvely for the use of the clie~] indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of outer apparently similar or identical materials. Page I of 5 o,-u.,,,~,.~,,,, ~ CONCRETE COMPRESSIVE STRENGTH TEST · Report Number: 94021029.0310 Service Date: June 20, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600W Dallas TX 75244 8901 Carpenter Fwe/., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: June 28, 2002 Project~ Amberpoint Building No. 1 Amberpoint Bus. Pk. t~ Coppell Coppell, TX Project Number: 94021029 Material Information Specified Strength: 4000 psi (~ 28 Days Batch Time: 5:37am Supplier: Potter Truck No: 107 Mix I.D. No.: 7752 Plant: 16 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature,° F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Ticket No: 614145 Sample Information Sample Time: 6:00am Date Cast: June 20, 2002 Technician: Marvin Arandia Weather Conditions: Clear Accumulative Yards: 120 Placement Method: Pump Sample Locations: See page 1 Placement Location: Pavement- SW of building & S & SE of building 2 3 2 4 Result Specification Test Method 6.00 ASTM C-143 80 ASTM C1064 77 ASTM C-1064 Age at Set Specimen Diameter Area Date Test Load St~p~th No. ID (inches) (~ Tested (days). (lbs) 2 1 6.00 28.27 06127/2002 7 98,850 3,500 2 2 6.00 28.27 06/2712002 ' 7 100,940 3,570 Average 3,540 07/18/2002 28 07/18/2002 28 Maximum Compressive Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast comp~-esslve strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the olisnt indicated above and shall nM be reproduced exce~ In full without the written approval of Terracen. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are nM necessarily indicative of the properties of other apparently simiisr or identical materials. Page 2 of 5 CONCRETE COMPRESSIVE STRENGTH TEST · Report Number: 94021029.0310 Service Date: June 20, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600W Dallas TX 75244 8901 Carpenter Fray., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: June 28, 2002 Project~ Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, TX Project Number:. 94021029 Material Information Specified Strength: 4000 psi ~ 28 Days Batch Time: 7:09am Supplieri Potter Truck No: 104 Mix I.D. No.: 7752 Plant: 16 Ticket No: 614157 Sample Information Sample Time: 7:40am Date Cast: June 20, 2002 Technician: Marvin Arandia Weather Conditions: Partly cloudy Accumulative Yards: 240 Placement Method: Pump Sample Locations: See page 1 Placement Location: Pavement- S & SE of building Field Test Data Test Result Specification Test Method Slump, inches: 6.00 ASTM C-143 Air Content, %: Concrete Temperature? F: 80 ASTM C1064 Ambient Temperature, o F: 79 ASTM C-1064 Plastic Unit Weight, pcf: Laboratory Test Data Age at Set Specimen Diameter Area Date Test No. ID (inches) (scI. inches) Tested (days) 3 1 6.00 28.27 06/27/2002. 7 3 2 6.00 28.27 06/2712002 7 Average 3 3 07/18~2002 28 3 4 07/18/2002 28 Maximum Compressive Load St~ep~th 107,180 3,790 111 ,.850 3,960 3,880 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test rnMheds. This report is exclusively for the usa of the client indicated above and shall not be reproduced e~cap~ in full without the written approval of Tenacon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and ara not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 5 ~w~,=,, ~ CONCRETE COMPRESSIVE STRENGTH TEST · 'Report Number: 94021029.0310 service Date: June 20, 2002 Client: Transwestem Commemial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600W Dallas TX 75244 8901 Carper~er Rwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: June 28, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, TX Project Number:. 94021029 Material Information Specified Strength: 4000 psi (~ 28 Days Batch Time: 8:30am Supplier:. Potter Truck No: 108 Mix I.D. No.: 7752 Plant: 16 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Ticket No: 614165 Sample Information Sample Time: 9:20am Date Cast: June 20, 2002 Technician: Marvin Arandia Weather Conditions: Partly cloudy Accumulative Yards: 320 Placement Method: Direct Discharge Sample Locations: See page 1 Placement Location: Pavement- S & SE of building 4 3 4 4 Result Specification Test Method 5.00 ASTM C-143 80 ASTM C1064 84 ASTM C-1064 Maximum Compressive Age at Set Specimen Diameter. Area Date Test Load St~.~h No. ID (inches} (sct. inches) Tested (days) ~lbs~ 4 1 6.00 28.27 06/27/2002 7 110,190 3,900 4 2 6.00 28.27 06/27/2002 7 111,200 3,930 Average - 3,920 07/18/2002 28 07/1812002 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced exce~ in full without the w~en approval of Ten'aeon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparen~ similar or identical materials. Page 4 of 5 ~'~'"'~"' CONCRETE COMPRESSIVE STRENGTH TEST 'Report Number: 94021029.0310 Service Date: June 20, 2002 Client: Transwestem Commemial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600W Dallas TX 75244 8901 Carpenter Frwy., Suite #t00 Dallas, Texas 75247 (214) 630-1010 Report Date: June 28, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. (~ Coppell Coppell, TX Project Number: 94021029 Material Information Specified Strength: 4000 psi ~ 28 Days Batch Time: 10:35am Plant: 16 Supplier: Potter Truck No: 420 Mix I.D. No.: 7752 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Result 5.75 85 Ticket No: 614175 Sample Information Sample Time: 11:00am Date Cast: June 20, 2002 Technician: Marvin Arandia Weather Conditions: Partly cloudy' Accumulative Yards: 420 Placement Method: Pump Sample Locations: See page 1 Placement Location: Pavement- SW of building Specification Test Method ASTM C-143 ASTM C1064 ASTM C-1064 Age at Set Specimen Diameter Area Date Test No. ID (inches) (sq. inches) Tested (days) 5 1 6.00 28.27 06/27/2002 7 5 2 6.00 28.27 06/27/2002 7 5 3 07/18/2002 5 4 07/18/2002 28 Maximum Compressive Load Strength (lbsI (psi) 95,640 3,380 106,540 3,770 Average 3,580 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Marvin Arandia Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Assoc (I) TachniStructurex (1) City of Copflell - Constr lnep (1) City of Coppeil - Bldg Inep (1) Hill & Wilkinson (1) Hsiff Assoc Inc (1) State Farm Insurance Reviewed by: HBC Eng~ E Eugene Herbour Pdnclpal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This repod is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results tmnemitted herein ere only appticabte to the actual samples tested at the Iocetion(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 5 of 5 PROJECT: PROJECT NO,: CALCD. BY: CHKD BY: DATE: DATE: