Loading...
ST0001-CS020703Suzan Ta for - RE: Pavement Markings From: "Schnitger, Chris" <cschnitger@sradesign.com> To: 'Suzan Taylor <staylor@ci.coppell.tx.us> Date: 713/02 1:23PM Subject: RE: Pavement Markings Suzan, I don't think we need to replace Item 124 with double 4 inch reflective white buttons. If we don't have a need for the reflective jiggle bars then we won't use them, but I think we had planned on putting the jiggle bars into the gore area within the HMAC transition on State Road. There is already a bid item ( #122) for 4 inch reflective buttons so if need more we already have a bid item and I'm pretty sure we put a few extra buttons in the bid quantity. The centerline pattern that you describe varies a little from the detail that you have in your standard details (SD -2). We based all of our counts off of the Standard Construction Details which should give us more than enough buttons for the revised spacing. There aren't any stop bars included in the contract. My plan is to sit down on Friday and sketch up the pavement markings. Should be quiet around here! O Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) �l (817649 -7649-76 45 5 FAX �[ -- Original Message ---- 1 From: Suzan Taylor [ mailto :staylorCci.coppell.tx.us] Sent: Monday, June 24, 20021:51 PM To: cschnitger@sradesign.com Subject: Pavement Markings Chris: Could we get a sketch showing the type and the location of all pavement markings. Item 124 will need to be replaced with double 4 -inch reflective white buttons. The pattern we are going to use for the centerline of Creekview Drive will be a 4 -inch yellow reflective in a 10 -foot span with a 30 -foot skip. Are stop bars included in the quantities. Thanks