Creekview P2 L1R BA-CS020628eresa umer - e: a on on the ree age 2
> From: "Teresa Tumer" <tturner@ci.coppell.tx.us>
> To: <kevin@spiarsengineering.com>
> Sent: Friday, June 28, 2002 1:34 PM
> Subject: Salon on the Creek
> > Kevin:
> > We do not have a standard detail for the flexbase however, we do
> > require 1 %: inch limestone flexbase. This is if you choose to use
> the
> > flexbase rather than lime stablization. The-rest of the detail is
> > exactly the same as if you were using lime. If you have specific
> > questions about the flexbase, I'd recommend contacting our
> construction
> > inspector, Lany Davis, af972-304.3684. -He'd be happy to help. I
> hope
> > this answers your question.
> > Teresa
>>