Loading...
Creekview P2 L1R BA-CS020701eresa urner - e: alon on t e ree Page 1 Y From: "Kevin S. Wier" <kevin(~spiarsengineering.com> To: "Teresa Tumer" <ttumerQci.coppell.tx.us> Date: 7/1/02 4:46:55 PM Subject: R8: Salon on the Creek The grades should not be a problem since the area around the utility box already drains towards the specimen tree. We are not proposing to change that drainage pattern. This sidewalk will meet ADA requirements and drain properly. We will show a new sidewalk alignment and easement on the plat. Kevin Wier > Kevin: > Ken said that you could show us a new proposed sidewalk location with > the necessary easement on the next submittal. He is concerned that it > may be difficult to move the sidewalk closer into the property due to > the grades but we'll consider it if yoU can make it work. > > The description for the rip-rap is fine. > Let me know if you have any other questions. Thanks. > Teresa > > »> "Kevin S. Wier" <kevin(dspiarsengineering.com> 7/1/02 6:34:45 AM > »> > Teresa: > Is there any update on the sidewalk/utility box conflict? Obviously we > would > prefer to just move the sidewalk towards the building and grant a > sidewalk > easement, rather than relocate the box. > ,. > Also, would the following description. of.the grouted rip-rap outfall > satisfy > your comment on sheet C3? > ---Install 2 SY of Grouted Rock Rip Rap (min. 4"diameter rock with > min. > 1000psi cement grout) . > Thanks. > Kevin Wier > Spiars Engineering, Inc. > 972-422-0077 > ----Original Message ---