Loading...
Valley R Baptist 2-CS020708' I f• July 8, 2002 Jim Riley, P.E. Brockette /Davis /Drake, Inc. 4144 N Central Expwy, Ste 1100 Dallas, TX 75204 RE: Valley Ranch Baptist Church Expansion Construction Plan Review Comments Dear Mr. Riley: The City of Coppell has determined that the revised plans meet our current minimum standards for construction. Please submit three sets of construction plans for the city's use and as many additional sets as necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved and signed by the City of Coppell. All fees must be paid prior to release of this project for construction. These fees consist of impact and construction inspection fees to be paid to this office. The City assesses a 2% inspection fee for all private construction onsite outside the building's footprint. This would include all dirt work, erosion control, paving, storm drain, water lines, sewer lines, drainage pipes, etc. that is private. For all public installations, the City of Coppell charges a 4% inspection fee. If you have any questions, please contact me at (972) 304 -3681. Sincerely, �aa Teresa M. Turner, E.I.T. Graduate Engineer 255 PARKWAY * P.O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673