PA9702-LR 990924CONCRETE COMPRE SIVE STRENGTH TES't
8901 Carpenter Frwy., Suite g 100
Dallas, Texas 75247
Date of Service: 09/16/1999 Report No.: 9925115 Report Date
09/24/1999
Client No.: COPPELL Project No.: 94991118
Client: City of Co pel| Project: Coppoll Aquatic/Recreation Ctr
Attn: Bra~Reid
732 DeForest 300 Block of Parkway Blvd
Coppell TX 75019 Coppoll, Texas/Prj. 4~)6051
Services: ~btainsamp~es~ffreshc~ncreteatthep~acement~~cati~ns~pe~~rmrequired~e~dtestandcast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A
CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 09/16/1999 BATCH TIME: N/A
PLANT: Lewisville TIME SAMPLED: 7:24am BY: Dean Martin
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 74 t~ CONCRETE: 84 F
SLUMP: 5.0" MAX TRUCK NO: 217 TICKET NO: 77669
AIR: N/A AIRCONTENT(%): N/A UNITWEIGHT(pc/): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Leisure Pool
ASTM C-172
ASTM C-39
SAMPLE LOCATION: SE comer
REPORT OF TESTS ACCt COLAT E YARns: 20
CYLINDER MEASURED MA~ COMPRESSIVE
MARKED SLLr/V!P DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 6.00 09/23/1999 7 97150 3440
1 2 6.00 09/23/1999 7 92160 3260
Average 3350
1 3 6.00 10/14/1999 28
1 4 6.00 10/14/1999 28
1 5 6.00 11/11/1999 56
Note: Concrete placed by pump. Sample taken at point of discharge.
Technician: Dean Manin Started: 5:30am Finished: 8:00am t'~ ~
Report Distribution: g~ Inc.
(1) City of Coppell (1) City ofCoppell - Engineering
(1) BrinkIcy Sargent Architects (1) City ofCoppelt - Bldg. Insp. Eugene Harbour
(1) Turner Engineers (1) City ofCoppell - Leisure Serv Dept Vice President
(1) Hisaw & Associates
This repor~ is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering Inc.
01TM Page 1 of 1