Loading...
PA0001-CS020503Suzan Ta for - MacArthur Park Page 1 From: Suzan Taylor To: Gary Sims Date: 5/3/02 11:OOAM Subject: MacArthur Park Gary: Rick O'Dell requested me to send the following e-mail: 1 would like to schedule a final walk- through on this project for next week. I still have a few things on my punch list which are: 1. re- stripe parking stall stripes where wom away ` N 2. repaint all ADA symbols because of excessive wear during construction; and ! „ ZSo !AC S(�aK7S 3. bring handicapped parking signs all to the same level. P� To Also, an item not part of the plan may require your attention: the sides of the retaining wall around the transformer have no protection to keep someone from falling off the wall. If you would like to be present during the walk- through, let me know which day would be best for you. I tenetatively have it down for Thursday, 05- 09-02, at 10:00 am. I also need copies of the record drawings and maintenance bond for my files. Since Russell Dyer is no longer employed by ACC, can you give me a contact name and telephone number for the person you are dealing with on this project? Thanks Rick O'Dell CC: Brad Reid; John Elias