PA0001-CS020503Suzan Ta for - MacArthur Park Page 1
From:
Suzan Taylor
To:
Gary Sims
Date:
5/3/02 11:OOAM
Subject:
MacArthur Park
Gary:
Rick O'Dell requested me to send the following e-mail:
1 would like to schedule a final walk- through on this project for next week. I still have a few things on my
punch list which are:
1. re- stripe parking stall stripes where wom away
` N 2. repaint all ADA symbols because of excessive wear during
construction; and ! „ ZSo !AC S(�aK7S
3. bring handicapped parking signs all to the same level. P� To
Also, an item not part of the plan may require your attention: the sides of the retaining wall around the
transformer have no protection to keep someone from falling off the wall.
If you would like to be present during the walk- through, let me know which day would be best for you. I
tenetatively have it down for Thursday, 05- 09-02, at 10:00 am. I also need copies of the record drawings
and maintenance bond for my files. Since Russell Dyer is no longer employed by ACC, can you give me a
contact name and telephone number for the person you are dealing with on this project?
Thanks
Rick O'Dell
CC: Brad Reid; John Elias